Review power assets, contract observations, facility specifications and relationships from public sources.
This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 2items · current page 1–2 · Source records, not unique facilities.
Power assets and projects · USA · eia860
Smoky Hills Wind Project Phase I
Generation facilities · Unverified
Metric or condition
Source value
Basis, scope and stage
Grid Voltage (kV)
230 kV
Original source column definition · Power plant · Unverified As-of date 2025 Sources EV-ad8e0b7b5a77c85bafdd70a4
Detailed source fields
Original source field
Published value or condition
Utility ID
55886
Utility Name
Smoky Hills Wind Farm I LLC
Plant Code
56488
Plant Name
Smoky Hills Wind Project Phase I
Street Address
223 North Highway 14
City
Lincoln
State
KS
Zip
67455
County
Lincoln
Latitude
38.879936
Longitude
-98.160159
NERC Region
MRO
Balancing Authority Code
SWPP
Balancing Authority Name
Southwest Power Pool
Primary Purpose (NAICS Code)
22
Regulatory Status
NR
Sector
2
Sector Name
IPP Non-CHP
FERC Cogeneration Status
N
FERC Small Power Producer Status
N
FERC Exempt Wholesale Generator Status
Y
FERC Exempt Wholesale Generator Docket Number
07-83-000
Ash Impoundment Lined?
X
Transmission or Distribution System Owner
Westar Energy Inc
Transmission or Distribution System Owner ID
22500
Transmission or Distribution System Owner State
KS
Grid Voltage (kV)
230
Energy Storage
N
Coordinate accuracy
source_precision_not_independently_surveyed
source_record_id
2___Plant_Y2025.xlsx#Plant:4797
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 1itemseia860 ↗
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.