Power assets and projects · USA · eia860
Sierra Pacific Anderson Facility
Generation facilities · Unverified
Metric or condition
Source value
Basis, scope and stage
Grid Voltage (kV)
115 kV
Original source column definition · Power plant · Unverified As-of date 2025 Sources EV-41ae4684750b95cb829a1a9b
Detailed source fields
Original source field
Published value or condition
Utility ID
17164
Utility Name
Sierra Pacific Industries
Plant Code
55049
Plant Name
Sierra Pacific Anderson Facility
Street Address
19758 Riverside Avenue
City
Anderson
State
CA
Zip
96007
County
Shasta
Latitude
40.4731
Longitude
-122.3206
NERC Region
WECC
Balancing Authority Code
CISO
Balancing Authority Name
California Independent System Operator
Name of Water Source
Well
Primary Purpose (NAICS Code)
321
Regulatory Status
NR
Sector
7
Sector Name
Industrial CHP
FERC Cogeneration Status
N
FERC Small Power Producer Status
Y
FERC Small Power Producer Docket Number
98-40-000
FERC Exempt Wholesale Generator Status
N
Ash Impoundment Lined?
X
Transmission or Distribution System Owner
Pacific Gas & Electric Co
Transmission or Distribution System Owner ID
14328
Transmission or Distribution System Owner State
CA
Grid Voltage (kV)
115
Coordinate accuracy
source_precision_not_independently_surveyed
source_record_id
2___Plant_Y2025.xlsx#Plant:3998
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 1itemseia860 ↗
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.