Review power assets, contract observations, facility specifications and relationships from public sources.
This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 2items · current page 1–2 · Source records, not unique facilities.
Power assets and projects · USA · eia860
Salton Sea Power Gen Co - Unit 4
Generation facilities · Unverified
Metric or condition
Source value
Basis, scope and stage
Grid Voltage (kV)
92 kV
Original source column definition · Power plant · Unverified As-of date 2025 Sources EV-b74cbc4010209b05b589439a
Detailed source fields
Original source field
Published value or condition
Utility ID
49899
Utility Name
CalEnergy Operating Corporation
Plant Code
54996
Plant Name
Salton Sea Power Gen Co - Unit 4
Street Address
6922 Crummer Rd.
City
Calipatria
State
CA
Zip
92233
County
Imperial
Latitude
33.157
Longitude
-115.6386
NERC Region
WECC
Balancing Authority Code
IID
Balancing Authority Name
Imperial Irrigation District
Name of Water Source
Colorado River
Primary Purpose (NAICS Code)
22
Regulatory Status
NR
Sector
2
Sector Name
IPP Non-CHP
FERC Cogeneration Status
N
FERC Small Power Producer Status
Y
FERC Small Power Producer Docket Number
86-1043-006
FERC Exempt Wholesale Generator Status
N
Ash Impoundment?
N
Ash Impoundment Lined?
X
Transmission or Distribution System Owner
Imperial Irrigation District
Transmission or Distribution System Owner ID
9216
Transmission or Distribution System Owner State
CA
Grid Voltage (kV)
92
Energy Storage
N
Coordinate accuracy
source_precision_not_independently_surveyed
source_record_id
2___Plant_Y2025.xlsx#Plant:3970
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 1itemseia860 ↗
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.