Power assets and projects · USA · eia860
Calderwood
Generation facilities · Unverified
Metric or condition
Source value
Basis, scope and stage
Grid Voltage (kV)
161 kV
Original source column definition · Power plant · Unverified As-of date 2025 Sources EV-862fafb5af5afb7b7b3e83ce
Detailed source fields
Original source field
Published value or condition
Utility ID
306
Utility Name
Brookfield Smoky Mountain Hydropower LP
Plant Code
54900
Plant Name
Calderwood
Street Address
314 Growdon Blvd.
City
Tallassee
State
TN
Zip
37878
County
Blount
Latitude
35.4923
Longitude
-83.9806
NERC Region
SERC
Balancing Authority Code
TVA
Balancing Authority Name
Tennessee Valley Authority
Name of Water Source
Little Tennessee River
Primary Purpose (NAICS Code)
22
Regulatory Status
NR
Sector
2
Sector Name
IPP Non-CHP
FERC Cogeneration Status
N
FERC Small Power Producer Status
N
FERC Exempt Wholesale Generator Status
N
Ash Impoundment?
N
Ash Impoundment Lined?
X
Transmission or Distribution System Owner
Tennessee Valley Authority
Transmission or Distribution System Owner ID
18642
Transmission or Distribution System Owner State
TN
Grid Voltage (kV)
161
Energy Storage
N
Natural Gas Storage
N
Liquefied Natural Gas Storage
N
Coordinate accuracy
source_precision_not_independently_surveyed
source_record_id
2___Plant_Y2025.xlsx#Plant:3929
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 1itemseia860 ↗
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.