Review power assets, contract observations, facility specifications and relationships from public sources.
This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 2items · current page 1–2 · Source records, not unique facilities.
Power assets and projects · USA · eia860
Alliant SBD 8501 Aegon LI
Generation facilities · Unverified
Metric or condition
Source value
Basis, scope and stage
Grid Voltage (kV)
0.48 kV
Original source column definition · Power plant · Unverified As-of date 2025 Sources EV-d48aa5fd00483465cac54343
Detailed source fields
Original source field
Published value or condition
Utility ID
361
Utility Name
Industrial Energy Applications Inc
Plant Code
54714
Plant Name
Alliant SBD 8501 Aegon LI
Street Address
4333 Edgewood Road NE
City
Cedar Rapids
State
IA
Zip
52499
County
Linn
Latitude
42.02425
Longitude
-91.70405
NERC Region
MRO
Balancing Authority Code
MISO
Balancing Authority Name
Midcontinent Independent Transmission System Operator, Inc..
Primary Purpose (NAICS Code)
22
Regulatory Status
NR
Sector
2
Sector Name
IPP Non-CHP
FERC Cogeneration Status
N
FERC Small Power Producer Status
N
FERC Exempt Wholesale Generator Status
N
Ash Impoundment?
N
Ash Impoundment Lined?
X
Transmission or Distribution System Owner
Interstate Power and Light Co
Transmission or Distribution System Owner ID
9417
Transmission or Distribution System Owner State
IA
Grid Voltage (kV)
0.48
Energy Storage
N
Natural Gas Storage
N
Liquefied Natural Gas Storage
X
Coordinate accuracy
source_precision_not_independently_surveyed
source_record_id
2___Plant_Y2025.xlsx#Plant:3842
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 1itemseia860 ↗
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.