Review power assets, contract observations, facility specifications and relationships from public sources.
This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 2items · current page 1–2 · Source records, not unique facilities.
Power assets and projects · USA · eia860
Rollinsford
Generation facilities · Unverified
Metric or condition
Source value
Basis, scope and stage
Grid Voltage (kV)
13.8 kV
Original source column definition · Power plant · Unverified As-of date 2025 Sources EV-ec02a9c52fc8d18ccdaad455
Detailed source fields
Original source field
Published value or condition
Utility ID
7601
Utility Name
Green Mountain Power Corp
Plant Code
54418
Plant Name
Rollinsford
Street Address
Front Street
City
Rollinsford
State
NH
Zip
3869
County
Strafford
Latitude
43.236111
Longitude
-70.817222
NERC Region
NPCC
Balancing Authority Code
ISNE
Balancing Authority Name
ISO New England Inc.
Name of Water Source
Salmon Falls River
Primary Purpose (NAICS Code)
22
Regulatory Status
RE
Sector
1
Sector Name
Electric Utility
FERC Cogeneration Status
N
FERC Small Power Producer Status
Y
FERC Small Power Producer Docket Number
01-24-000
FERC Exempt Wholesale Generator Status
N
Ash Impoundment Lined?
X
Transmission or Distribution System Owner
Public Service Co of NH
Transmission or Distribution System Owner ID
15472
Transmission or Distribution System Owner State
NH
Grid Voltage (kV)
13.8
Energy Storage
N
Coordinate accuracy
source_precision_not_independently_surveyed
source_record_id
2___Plant_Y2025.xlsx#Plant:3735
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 1itemseia860 ↗
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.