Power assets and projects · USA · eia860
EHC West Hopkinton
Generation facilities · Unverified
Metric or condition
Source value
Basis, scope and stage
Grid Voltage (kV)
34.5 kV
Original source column definition · Power plant · Unverified As-of date 2025 Sources EV-89cf94f335779efc9de00a53
Detailed source fields
Original source field
Published value or condition
Utility ID
7601
Utility Name
Green Mountain Power Corp
Plant Code
54384
Plant Name
EHC West Hopkinton
Street Address
Route 127
City
West Hopkinton
State
NH
Zip
3229
County
Merrimack
Latitude
43.1897
Longitude
-71.7483
NERC Region
NPCC
Balancing Authority Code
ISNE
Balancing Authority Name
ISO New England Inc.
Name of Water Source
Contoocook River
Primary Purpose (NAICS Code)
22
Regulatory Status
RE
Sector
1
Sector Name
Electric Utility
FERC Cogeneration Status
N
FERC Small Power Producer Status
Y
FERC Small Power Producer Docket Number
01-20-000
FERC Exempt Wholesale Generator Status
N
Ash Impoundment Lined?
X
Transmission or Distribution System Owner
Public Service Co of NH
Transmission or Distribution System Owner ID
15472
Transmission or Distribution System Owner State
NH
Grid Voltage (kV)
34.5
Energy Storage
N
Coordinate accuracy
source_precision_not_independently_surveyed
source_record_id
2___Plant_Y2025.xlsx#Plant:3719
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 1itemseia860 ↗
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.