Review power assets, contract observations, facility specifications and relationships from public sources.
This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 2items · current page 1–2 · Source records, not unique facilities.
Power assets and projects · USA · eia860
Archer Daniels Midland Little Rock
Generation facilities · Unverified
Metric or condition
Source value
Basis, scope and stage
Grid Voltage (kV)
34 kV
Original source column definition · Power plant · Unverified As-of date 2025 Sources EV-0a1604aa7d54566a25833463
Detailed source fields
Original source field
Published value or condition
Utility ID
772
Utility Name
Archer Daniels Midland Co
Plant Code
54311
Plant Name
Archer Daniels Midland Little Rock
Street Address
Foot of E 9th Street
City
Little Rock
State
AR
Zip
72203
County
Pulaski
Latitude
34.7
Longitude
-92.199722
NERC Region
SERC
Balancing Authority Code
MISO
Balancing Authority Name
Midcontinent Independent Transmission System Operator, Inc..
Name of Water Source
Municipality
Primary Purpose (NAICS Code)
311
Regulatory Status
NR
Sector
7
Sector Name
Industrial CHP
FERC Cogeneration Status
N
FERC Small Power Producer Status
N
FERC Exempt Wholesale Generator Status
N
Ash Impoundment Lined?
X
Transmission or Distribution System Owner
Entergy Arkansas Inc
Transmission or Distribution System Owner ID
814
Transmission or Distribution System Owner State
AR
Grid Voltage (kV)
34
Coordinate accuracy
source_precision_not_independently_surveyed
source_record_id
2___Plant_Y2025.xlsx#Plant:3692
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 1itemseia860 ↗
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.