Review power assets, contract observations, facility specifications and relationships from public sources.
This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 2items · current page 1–2 · Source records, not unique facilities.
Power assets and projects · USA · eia860
Lower Molina
Generation facilities · Unverified
Metric or condition
Source value
Basis, scope and stage
Grid Voltage (kV)
115 kV
Original source column definition · Power plant · Unverified As-of date 2025 Sources EV-2707ef4514b9f6e5421015fe
Detailed source fields
Original source field
Published value or condition
Utility ID
2518
Utility Name
U S Bureau of Reclamation
Plant Code
520
Plant Name
Lower Molina
Street Address
n/a
City
Molina
State
CO
Zip
81401
County
Mesa
Latitude
39.19366
Longitude
-108.044088
NERC Region
WECC
Balancing Authority Code
WACM
Balancing Authority Name
Western Area Power Administration - Rocky Mountain Region
Name of Water Source
Bonham Reservoir
Primary Purpose (NAICS Code)
22
Regulatory Status
RE
Sector
1
Sector Name
Electric Utility
FERC Cogeneration Status
N
FERC Small Power Producer Status
N
FERC Exempt Wholesale Generator Status
N
Ash Impoundment?
N
Ash Impoundment Lined?
X
Transmission or Distribution System Owner
WAPA-- Western Area Power Administration
Transmission or Distribution System Owner ID
27000
Transmission or Distribution System Owner State
CO
Grid Voltage (kV)
115
Energy Storage
N
Coordinate accuracy
source_precision_not_independently_surveyed
source_record_id
2___Plant_Y2025.xlsx#Plant:344
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 1itemseia860 ↗
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.