Review power assets, contract observations, facility specifications and relationships from public sources.
This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 2items · current page 1–2 · Source records, not unique facilities.
Power assets and projects · USA · eia860
Decker Creek
Generation facilities · Unverified
Metric or condition
Source value
Basis, scope and stage
Grid Voltage (kV)
138 kV
Original source column definition · Power plant · Unverified As-of date 2025 Sources EV-c97f32d70aff2259eceb81dc
Detailed source fields
Original source field
Published value or condition
Utility ID
1015
Utility Name
Austin Energy
Plant Code
3548
Plant Name
Decker Creek
Street Address
8003 Decker Ln
City
Austin
State
TX
Zip
78724
County
Travis
Latitude
30.3033
Longitude
-97.6128
NERC Region
TRE
Balancing Authority Code
ERCO
Balancing Authority Name
Electric Reliability Council of Texas, Inc.
Name of Water Source
Lake Walter E. Long
Primary Purpose (NAICS Code)
22
Regulatory Status
RE
Sector
1
Sector Name
Electric Utility
FERC Cogeneration Status
N
FERC Small Power Producer Status
N
FERC Exempt Wholesale Generator Status
N
Ash Impoundment Lined?
X
Transmission or Distribution System Owner
Austin Energy
Transmission or Distribution System Owner ID
1015
Transmission or Distribution System Owner State
TX
Grid Voltage (kV)
138
Energy Storage
N
Natural Gas Pipeline Name 1
ENTERPRISE TEXAS PIPELINE
Natural Gas Storage
N
Coordinate accuracy
source_precision_not_independently_surveyed
source_record_id
2___Plant_Y2025.xlsx#Plant:1686
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 1itemseia860 ↗
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.