Review power assets, contract observations, facility specifications and relationships from public sources.
This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 2items · current page 1–2 · Source records, not unique facilities.
Power assets and projects · USA · eia860
TalenEnergy Martins Creek LLC Harwood
Generation facilities · Unverified
Metric or condition
Source value
Basis, scope and stage
Grid Voltage (kV)
69 kV
Original source column definition · Power plant · Unverified As-of date 2025 Sources EV-78f11a30ad575f5565917792
Detailed source fields
Original source field
Published value or condition
Utility ID
15276
Utility Name
TalenEnergy Martins Creek LLC
Plant Code
3144
Plant Name
TalenEnergy Martins Creek LLC Harwood
Street Address
Rt. 924
City
West Hazleton
State
PA
Zip
18201
County
Luzerne
Latitude
40.9353
Longitude
-76.0284
NERC Region
RFC
Balancing Authority Code
PJM
Balancing Authority Name
PJM Interconnection, LLC
Primary Purpose (NAICS Code)
22
Regulatory Status
NR
Sector
2
Sector Name
IPP Non-CHP
FERC Cogeneration Status
N
FERC Small Power Producer Status
N
FERC Exempt Wholesale Generator Status
Y
FERC Exempt Wholesale Generator Docket Number
00-41-000
Ash Impoundment?
N
Ash Impoundment Lined?
X
Transmission or Distribution System Owner
PPL Electric Utilities Corp
Transmission or Distribution System Owner ID
14715
Transmission or Distribution System Owner State
PA
Grid Voltage (kV)
69
Energy Storage
N
Natural Gas Storage
X
Liquefied Natural Gas Storage
X
Coordinate accuracy
source_precision_not_independently_surveyed
source_record_id
2___Plant_Y2025.xlsx#Plant:1537
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 1itemseia860 ↗
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.