Power assets and projects · USA · eia860

Stanton

Generation facilities · Unverified

Metric or conditionSource valueBasis, scope and stage
Grid Voltage (kV)230 kVOriginal source column definition · Power plant · Unverified
As-of date 2025
Sources EV-71ff7d78f8ad689af8816b26
Detailed source fields
Original source fieldPublished value or condition
Utility ID7570
Utility NameGreat River Energy
Plant Code2824
Plant NameStanton
Street Address4001 Highway 200 A
CityStanton
StateND
Zip58571
CountyMercer
Latitude47.286643
Longitude-101.331908
NERC RegionMRO
Balancing Authority CodeMISO
Balancing Authority NameMidcontinent Independent Transmission System Operator, Inc..
Name of Water SourceMissouri River
Primary Purpose (NAICS Code)22
Regulatory StatusRE
Sector1
Sector NameElectric Utility
FERC Cogeneration StatusN
FERC Small Power Producer StatusN
FERC Exempt Wholesale Generator StatusN
Ash Impoundment?Y
Ash Impoundment Lined?Y
Ash Impoundment StatusOP
Transmission or Distribution System OwnerGreat River Energy
Transmission or Distribution System Owner ID7570
Grid Voltage (kV)230
Energy StorageN
Natural Gas StorageN
Liquefied Natural Gas StorageN
Coordinate accuracysource_precision_not_independently_surveyed
source_record_id2___Plant_Y2025.xlsx#Plant:1421

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 2___Plant_Y2025.xlsx#Plant:1421

Sources EV-71ff7d78f8ad689af8816b26
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 27cf3ee393b27ff775cc862896cd5c9db413f6407a7b6f38aa3a59440c38b92f

Usage terms US government public domain

Source snapshots by date · USA · eia860

Stanton

Power plant · Unverified

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Utility ID7570
Utility NameGreat River Energy
Plant Code2824
Plant NameStanton
Street Address4001 Highway 200 A
CityStanton
StateND
Zip58571
CountyMercer
Latitude47.286643
Longitude-101.331908
NERC RegionMRO
Balancing Authority CodeMISO
Balancing Authority NameMidcontinent Independent Transmission System Operator, Inc..
Name of Water SourceMissouri River
Primary Purpose (NAICS Code)22
Regulatory StatusRE
Sector1
Sector NameElectric Utility
FERC Cogeneration StatusN
FERC Small Power Producer StatusN
FERC Exempt Wholesale Generator StatusN
Ash Impoundment?Y
Ash Impoundment Lined?Y
Ash Impoundment StatusOP
Transmission or Distribution System OwnerGreat River Energy
Transmission or Distribution System Owner ID7570
Grid Voltage (kV)230
Energy StorageN
Natural Gas StorageN
Liquefied Natural Gas StorageN
source_record_id2___Plant_Y2025.xlsx#Plant:1421

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 2___Plant_Y2025.xlsx#Plant:1421

Sources EV-71ff7d78f8ad689af8816b26
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 27cf3ee393b27ff775cc862896cd5c9db413f6407a7b6f38aa3a59440c38b92f

Usage terms US government public domain

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel