Review power assets, contract observations, facility specifications and relationships from public sources.
This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 2items · current page 1–2 · Source records, not unique facilities.
Power assets and projects · USA · eia860
Paragould
Generation facilities · Unverified
Metric or condition
Source value
Basis, scope and stage
Grid Voltage (kV)
13.2 kV
Original source column definition · Power plant · Unverified As-of date 2025 Sources EV-353cab1d11145a9388bc2d8e
Detailed source fields
Original source field
Published value or condition
Utility ID
14446
Utility Name
Paragould Municipal Utilities (AR)
Plant Code
192
Plant Name
Paragould
Street Address
Poplar Street
City
Paragould
State
AR
Zip
72450
County
Greene
Latitude
36.060556
Longitude
-90.521389
NERC Region
MRO
Balancing Authority Code
SPA
Balancing Authority Name
Southwestern Power Administration
Name of Water Source
Wells
Primary Purpose (NAICS Code)
22
Regulatory Status
RE
Sector
1
Sector Name
Electric Utility
FERC Cogeneration Status
N
FERC Small Power Producer Status
N
FERC Exempt Wholesale Generator Status
N
Ash Impoundment Lined?
X
Transmission or Distribution System Owner
Paragould Light & Water Comm
Transmission or Distribution System Owner ID
14446
Transmission or Distribution System Owner State
AR
Grid Voltage (kV)
13.2
Energy Storage
N
Natural Gas Storage
N
Liquefied Natural Gas Storage
X
Coordinate accuracy
source_precision_not_independently_surveyed
source_record_id
2___Plant_Y2025.xlsx#Plant:108
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 1itemseia860 ↗
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.