Review power assets, contract observations, facility specifications and relationships from public sources.
This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 2items · current page 1–2 · Source records, not unique facilities.
Power assets and projects · USA · eia860
Androscoggin 3
Generation facilities · Unverified
Metric or condition
Source value
Basis, scope and stage
Grid Voltage (kV)
34 kV
Original source column definition · Power plant · Unverified As-of date 2025 Sources EV-3e791b6a75ff050a216ac923
Detailed source fields
Original source field
Published value or condition
Utility ID
39006
Utility Name
Brookfield White Pine Hydro LLC
Plant Code
1480
Plant Name
Androscoggin 3
Street Address
80 Switzerland Rd
City
Lewiston
State
ME
Zip
4240
County
Androscoggin
Latitude
44.135332
Longitude
-70.201499
NERC Region
NPCC
Balancing Authority Code
ISNE
Balancing Authority Name
ISO New England Inc.
Name of Water Source
Androscoggin River
Primary Purpose (NAICS Code)
22
Regulatory Status
NR
Sector
2
Sector Name
IPP Non-CHP
FERC Cogeneration Status
N
FERC Small Power Producer Status
N
FERC Exempt Wholesale Generator Status
Y
FERC Exempt Wholesale Generator Docket Number
99-35-000
Ash Impoundment?
N
Ash Impoundment Lined?
X
Transmission or Distribution System Owner
Central Maine Power Co
Transmission or Distribution System Owner ID
3266
Transmission or Distribution System Owner State
ME
Grid Voltage (kV)
34
Energy Storage
N
Coordinate accuracy
source_precision_not_independently_surveyed
source_record_id
2___Plant_Y2025.xlsx#Plant:824
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 1itemseia860 ↗
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.