Review power assets, contract observations, facility specifications and relationships from public sources.
This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 2items · current page 1–2 · Source records, not unique facilities.
Power assets and projects · USA · eia860
Crosscut
Generation facilities · Unverified
Metric or condition
Source value
Basis, scope and stage
Grid Voltage (kV)
4.16 kV
Original source column definition · Power plant · Unverified As-of date 2025 Sources EV-5a87d577916cee1194009c66
Detailed source fields
Original source field
Published value or condition
Utility ID
16572
Utility Name
Salt River Project
Plant Code
143
Plant Name
Crosscut
Street Address
998 W. Washington St.
City
Tempe
State
AZ
Zip
85281
County
Maricopa
Latitude
33.439375
Longitude
-111.946052
NERC Region
WECC
Balancing Authority Code
SRP
Balancing Authority Name
Salt River Project
Name of Water Source
Crosscut Canal
Primary Purpose (NAICS Code)
22
Regulatory Status
RE
Sector
1
Sector Name
Electric Utility
FERC Cogeneration Status
N
FERC Small Power Producer Status
N
FERC Exempt Wholesale Generator Status
N
Ash Impoundment?
N
Ash Impoundment Lined?
X
Transmission or Distribution System Owner
Salt River Project
Transmission or Distribution System Owner ID
16572
Transmission or Distribution System Owner State
AZ
Grid Voltage (kV)
4.16
Energy Storage
N
Natural Gas Pipeline Name 1
None
Natural Gas Storage
N
Coordinate accuracy
source_precision_not_independently_surveyed
source_record_id
2___Plant_Y2025.xlsx#Plant:79
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 1itemseia860 ↗
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.