POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Power assets and projects · USA · eia860m

Ashton / 3

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)2 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-c40d9b7cace5bb9f9a3675ea
Net Summer Capacity (MW)2.2 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-c40d9b7cace5bb9f9a3675ea
Net Winter Capacity (MW)2.2 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-c40d9b7cace5bb9f9a3675ea
Detailed source fields
Original source fieldPublished value or condition
Entity ID14354
Entity NamePacifiCorp
Plant ID825
Plant NameAshton
Google MapMap
Bing MapMap
Plant StateID
CountyFremont
Balancing Authority CodePACE
SectorElectric Utility
Generator ID3
Nameplate Capacity (MW)2
Net Summer Capacity (MW)2.2
Net Winter Capacity (MW)2.2
TechnologyConventional Hydroelectric
Energy Source CodeWAT
Prime Mover CodeHY
Operating Month7
Operating Year1925
Status(OP) Operating
Latitude44.07863
Longitude-111.4973
Original text(OP) Operating
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idOperating:1379

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:1373

Sources EV-c7daada922e6551502ac4e51
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 0e2c361ad789790bb1cb411816f1039c045720baeb9597c2516cbacf820caef9

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:1379

Sources EV-c40d9b7cace5bb9f9a3675ea
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 43162940c91f01ee2c702029e72cc67e167cf2428a50d496de3b9991c3dd160c

Usage terms US government public domain

Source snapshots by date · USA · eia860m

Ashton / 3

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Entity ID14354
Entity NamePacifiCorp
Plant ID825
Plant NameAshton
Google MapMap
Bing MapMap
Plant StateID
CountyFremont
Balancing Authority CodePACE
SectorElectric Utility
Generator ID3
Nameplate Capacity (MW)2
Net Summer Capacity (MW)2.2
Net Winter Capacity (MW)2.2
TechnologyConventional Hydroelectric
Energy Source CodeWAT
Prime Mover CodeHY
Operating Month7
Operating Year1925
Status(OP) Operating
Latitude44.07863
Longitude-111.4973
Original text(OP) Operating
source_record_idOperating:1379

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:1379

Sources EV-c40d9b7cace5bb9f9a3675ea
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 43162940c91f01ee2c702029e72cc67e167cf2428a50d496de3b9991c3dd160c

Usage terms US government public domain

Source snapshots by date · USA · eia860

Ashton / 3

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Utility ID14354
Utility NamePacifiCorp
Plant Code825
Plant NameAshton
StateID
CountyFremont
Generator ID3
TechnologyConventional Hydroelectric
Prime MoverHY
OwnershipS
Duct BurnersX
Can Bypass Heat Recovery Steam Generator?X
Nameplate Capacity (MW)2
Nameplate Power Factor0.8
Summer Capacity (MW)2.2
Winter Capacity (MW)2.2
Minimum Load (MW)0.1
Uprate or Derate Completed During YearN
StatusOP
Synchronized to Transmission GridX
Operating Month7
Operating Year1925
Associated with Combined Heat and Power SystemN
Sector NameElectric Utility
Sector1
Topping or BottomingX
Energy Source 1WAT
Solid Fuel Gasification System?N
Carbon Capture Technology?N
Time from Cold Shutdown to Full Load10M
Multiple Fuels?N
Original textOP
source_record_id3_1_Generator_Y2025.xlsx#Operable:1373

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:1373

Sources EV-c7daada922e6551502ac4e51
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 0e2c361ad789790bb1cb411816f1039c045720baeb9597c2516cbacf820caef9

Usage terms US government public domain

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel