POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Power assets and projects · USA · eia860m

Huntington / 1

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)498 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-db1bc7c512c93871cb3ae323
Net Summer Capacity (MW)459 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-db1bc7c512c93871cb3ae323
Net Winter Capacity (MW)459 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-db1bc7c512c93871cb3ae323
Detailed source fields
Original source fieldPublished value or condition
Entity ID14354
Entity NamePacifiCorp
Plant ID8069
Plant NameHuntington
Google MapMap
Bing MapMap
Plant StateUT
CountyEmery
Balancing Authority CodePACE
SectorElectric Utility
Generator ID1
Nameplate Capacity (MW)498
Net Summer Capacity (MW)459
Net Winter Capacity (MW)459
TechnologyConventional Steam Coal
Energy Source CodeBIT
Prime Mover CodeST
Operating Month6
Operating Year1977
Status(OP) Operating
Latitude39.3792
Longitude-111.0781
Original text(OP) Operating
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idOperating:8135

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:8133

Sources EV-a0cc659b4c028122715b7f9a
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 0bf91c0d3e7da0fb6a0ea40d00d6db3076d284d7636ab2be2dd04f5ad49c576b

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:8135

Sources EV-db1bc7c512c93871cb3ae323
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 f29d63ac3eed484a5588cc88288301055f3f78d5c4ca14e52481dad0da4f762c

Usage terms US government public domain

Source snapshots by date · USA · eia860

Huntington / 1

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Utility ID14354
Utility NamePacifiCorp
Plant Code8069
Plant NameHuntington
StateUT
CountyEmery
Generator ID1
TechnologyConventional Steam Coal
Prime MoverST
OwnershipS
Duct BurnersX
Can Bypass Heat Recovery Steam Generator?X
Nameplate Capacity (MW)498
Nameplate Power Factor0.92
Summer Capacity (MW)459
Winter Capacity (MW)459
Minimum Load (MW)60
Uprate or Derate Completed During YearN
StatusOP
Synchronized to Transmission GridX
Operating Month6
Operating Year1977
Associated with Combined Heat and Power SystemN
Sector NameElectric Utility
Sector1
Topping or BottomingX
Energy Source 1BIT
Startup Source 1DFO
Solid Fuel Gasification System?N
Time from Cold Shutdown to Full LoadOVER
Pulverized Coal Technology?Y
Subcritical Technology?Y
Multiple Fuels?N
Original textOP
source_record_id3_1_Generator_Y2025.xlsx#Operable:8133

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:8133

Sources EV-a0cc659b4c028122715b7f9a
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 0bf91c0d3e7da0fb6a0ea40d00d6db3076d284d7636ab2be2dd04f5ad49c576b

Usage terms US government public domain

Source snapshots by date · USA · eia860m

Huntington / 1

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Entity ID14354
Entity NamePacifiCorp
Plant ID8069
Plant NameHuntington
Google MapMap
Bing MapMap
Plant StateUT
CountyEmery
Balancing Authority CodePACE
SectorElectric Utility
Generator ID1
Nameplate Capacity (MW)498
Net Summer Capacity (MW)459
Net Winter Capacity (MW)459
TechnologyConventional Steam Coal
Energy Source CodeBIT
Prime Mover CodeST
Operating Month6
Operating Year1977
Status(OP) Operating
Latitude39.3792
Longitude-111.0781
Original text(OP) Operating
source_record_idOperating:8135

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:8135

Sources EV-db1bc7c512c93871cb3ae323
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 f29d63ac3eed484a5588cc88288301055f3f78d5c4ca14e52481dad0da4f762c

Usage terms US government public domain

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel