POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Power assets and projects · USA · eia860m

Intercession City / P10

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)103.5 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-d4d45004efe450889fde5bf2
Net Summer Capacity (MW)74 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-d4d45004efe450889fde5bf2
Net Winter Capacity (MW)86 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-d4d45004efe450889fde5bf2
Detailed source fields
Original source fieldPublished value or condition
Entity ID6455
Entity NameDuke Energy Florida, LLC
Plant ID8049
Plant NameIntercession City
Google MapMap
Bing MapMap
Plant StateFL
CountyOsceola
Balancing Authority CodeFPC
SectorElectric Utility
Generator IDP10
Nameplate Capacity (MW)103.5
Net Summer Capacity (MW)74
Net Winter Capacity (MW)86
TechnologyNatural Gas Fired Combustion Turbine
Energy Source CodeNG
Prime Mover CodeGT
Operating Month10
Operating Year1993
Status(OP) Operating
Latitude28.262778
Longitude-81.54861
Original text(OP) Operating
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idOperating:8092

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:8090

Sources EV-7051f07d900c94455a26abce
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 13e800a5771e3a7c77b55a9a0ba82fe2958244780d3e278271123fec7f363a99

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:8092

Sources EV-d4d45004efe450889fde5bf2
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 8891d35e603ae430a7ce8c1d2b00302075a0a9e5f961aa73d99e07ce149a0d66

Usage terms US government public domain

Source snapshots by date · USA · eia860

Intercession City / P10

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Utility ID6455
Utility NameDuke Energy Florida, LLC
Plant Code8049
Plant NameIntercession City
StateFL
CountyOsceola
Generator IDP10
TechnologyNatural Gas Fired Combustion Turbine
Prime MoverGT
OwnershipS
Duct BurnersX
Can Bypass Heat Recovery Steam Generator?X
Nameplate Capacity (MW)103.5
Nameplate Power Factor0.85
Summer Capacity (MW)74
Winter Capacity (MW)86
Minimum Load (MW)40
Uprate or Derate Completed During YearN
StatusOP
Synchronized to Transmission GridX
Operating Month10
Operating Year1993
Associated with Combined Heat and Power SystemN
Sector NameElectric Utility
Sector1
Topping or BottomingX
Energy Source 1NG
Energy Source 2DFO
Solid Fuel Gasification System?N
Carbon Capture Technology?N
Time from Cold Shutdown to Full Load1H
Multiple Fuels?Y
Cofire Fuels?N
Switch Between Oil and Natural Gas?Y
Original textOP
source_record_id3_1_Generator_Y2025.xlsx#Operable:8090

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:8090

Sources EV-7051f07d900c94455a26abce
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 13e800a5771e3a7c77b55a9a0ba82fe2958244780d3e278271123fec7f363a99

Usage terms US government public domain

Source snapshots by date · USA · eia860m

Intercession City / P10

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Entity ID6455
Entity NameDuke Energy Florida, LLC
Plant ID8049
Plant NameIntercession City
Google MapMap
Bing MapMap
Plant StateFL
CountyOsceola
Balancing Authority CodeFPC
SectorElectric Utility
Generator IDP10
Nameplate Capacity (MW)103.5
Net Summer Capacity (MW)74
Net Winter Capacity (MW)86
TechnologyNatural Gas Fired Combustion Turbine
Energy Source CodeNG
Prime Mover CodeGT
Operating Month10
Operating Year1993
Status(OP) Operating
Latitude28.262778
Longitude-81.54861
Original text(OP) Operating
source_record_idOperating:8092

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:8092

Sources EV-d4d45004efe450889fde5bf2
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 8891d35e603ae430a7ce8c1d2b00302075a0a9e5f961aa73d99e07ce149a0d66

Usage terms US government public domain

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel