POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Power assets and projects · USA · eia860m

Blue Lake / BLL09

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)9.8 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-baa821035f146acc2ceb2b95
Net Summer Capacity (MW)9.4 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-baa821035f146acc2ceb2b95
Net Winter Capacity (MW)9.4 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-baa821035f146acc2ceb2b95
Detailed source fields
Original source fieldPublished value or condition
Entity ID13781
Entity NameNorthern States Power Co - Minnesota
Plant ID8027
Plant NameBlue Lake
Google MapMap
Bing MapMap
Plant StateMN
CountyScott
Balancing Authority CodeMISO
SectorElectric Utility
Generator IDBLL09
Nameplate Capacity (MW)9.8
Net Summer Capacity (MW)9.4
Net Winter Capacity (MW)9.4
TechnologyNatural Gas Internal Combustion Engine
Energy Source CodeNG
Prime Mover CodeIC
Operating Month12
Operating Year2025
Status(OP) Operating
Latitude44.7855
Longitude-93.4315
Original text(OP) Operating
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idOperating:8067

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:8065

Sources EV-a6c62593c5b15a91416f87ea
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 6ba9920761dc509f8c9ff96cff1bf85fc69b06643e1a291a2a06c433d644b767

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:8067

Sources EV-baa821035f146acc2ceb2b95
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 efd01381b20c5374d70ad965ec4e239fadbf7e97dd6deb60f95cefde4349c63a

Usage terms US government public domain

Source snapshots by date · USA · eia860

Blue Lake / BLL09

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Utility ID13781
Utility NameNorthern States Power Co - Minnesota
Plant Code8027
Plant NameBlue Lake
StateMN
CountyScott
Generator IDBLL09
TechnologyNatural Gas Internal Combustion Engine
Prime MoverIC
OwnershipS
Duct BurnersX
Can Bypass Heat Recovery Steam Generator?X
Nameplate Capacity (MW)9.8
Nameplate Power Factor0.84
Summer Capacity (MW)9.4
Winter Capacity (MW)9.4
Minimum Load (MW)4
Uprate or Derate Completed During YearN
StatusOP
Synchronized to Transmission GridX
Operating Month12
Operating Year2025
Associated with Combined Heat and Power SystemN
Sector NameElectric Utility
Sector1
Topping or BottomingX
Energy Source 1NG
Energy Source 2DFO
Solid Fuel Gasification System?N
Time from Cold Shutdown to Full Load10M
Multiple Fuels?Y
Cofire Fuels?N
Switch Between Oil and Natural Gas?Y
Original textOP
source_record_id3_1_Generator_Y2025.xlsx#Operable:8065

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:8065

Sources EV-a6c62593c5b15a91416f87ea
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 6ba9920761dc509f8c9ff96cff1bf85fc69b06643e1a291a2a06c433d644b767

Usage terms US government public domain

Source snapshots by date · USA · eia860m

Blue Lake / BLL09

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Entity ID13781
Entity NameNorthern States Power Co - Minnesota
Plant ID8027
Plant NameBlue Lake
Google MapMap
Bing MapMap
Plant StateMN
CountyScott
Balancing Authority CodeMISO
SectorElectric Utility
Generator IDBLL09
Nameplate Capacity (MW)9.8
Net Summer Capacity (MW)9.4
Net Winter Capacity (MW)9.4
TechnologyNatural Gas Internal Combustion Engine
Energy Source CodeNG
Prime Mover CodeIC
Operating Month12
Operating Year2025
Status(OP) Operating
Latitude44.7855
Longitude-93.4315
Original text(OP) Operating
source_record_idOperating:8067

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:8067

Sources EV-baa821035f146acc2ceb2b95
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 efd01381b20c5374d70ad965ec4e239fadbf7e97dd6deb60f95cefde4349c63a

Usage terms US government public domain

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel