Power assets and projects · USA · eia860m

Silver Creek / 1

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)83.5 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-4b6ac3b2c29efdbb0c77c2ed
Net Summer Capacity (MW)75 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-4b6ac3b2c29efdbb0c77c2ed
Net Winter Capacity (MW)83.5 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-4b6ac3b2c29efdbb0c77c2ed
Detailed source fields
Original source fieldPublished value or condition
Entity ID17568
Entity NameCooperative Energy
Plant ID7988
Plant NameSilver Creek
Google MapMap
Bing MapMap
Plant StateMS
CountyJefferson Davis
Balancing Authority CodeMISO
SectorElectric Utility
Generator ID1
Nameplate Capacity (MW)83.5
Net Summer Capacity (MW)75
Net Winter Capacity (MW)83.5
TechnologyNatural Gas Fired Combustion Turbine
Energy Source CodeNG
Prime Mover CodeGT
Operating Month6
Operating Year2003
Status(OP) Operating
Latitude31.6004
Longitude-89.9468
Original text(OP) Operating
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idOperating:7973

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:7971

Sources EV-3210369f4b02bf6da3248111
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 392a9719b6c7719c40090e82ca941e433629b3f22440afe6a4b891e8d3d930c4

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:7973

Sources EV-4b6ac3b2c29efdbb0c77c2ed
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 5d62c4a2fd2f7afb1a0fb7ce01eb9346d3f4f1007a34fbed9a713a07da801615

Usage terms US government public domain

Source snapshots by date · USA · eia860

Silver Creek / 1

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Utility ID17568
Utility NameCooperative Energy
Plant Code7988
Plant NameSilver Creek
StateMS
CountyJefferson Davis
Generator ID1
TechnologyNatural Gas Fired Combustion Turbine
Prime MoverGT
OwnershipS
Duct BurnersX
Can Bypass Heat Recovery Steam Generator?X
RTO/ISO LMP Node DesignationSME.SLVRCRK_1
Nameplate Capacity (MW)83.5
Nameplate Power Factor0.85
Summer Capacity (MW)75
Winter Capacity (MW)83.5
Minimum Load (MW)53
Uprate or Derate Completed During YearN
StatusOP
Synchronized to Transmission GridX
Operating Month6
Operating Year2003
Associated with Combined Heat and Power SystemN
Sector NameElectric Utility
Sector1
Topping or BottomingX
Energy Source 1NG
Solid Fuel Gasification System?N
Time from Cold Shutdown to Full Load1H
Multiple Fuels?N
Cofire Fuels?N
Original textOP
source_record_id3_1_Generator_Y2025.xlsx#Operable:7971

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:7971

Sources EV-3210369f4b02bf6da3248111
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 392a9719b6c7719c40090e82ca941e433629b3f22440afe6a4b891e8d3d930c4

Usage terms US government public domain

Source snapshots by date · USA · eia860m

Silver Creek / 1

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Entity ID17568
Entity NameCooperative Energy
Plant ID7988
Plant NameSilver Creek
Google MapMap
Bing MapMap
Plant StateMS
CountyJefferson Davis
Balancing Authority CodeMISO
SectorElectric Utility
Generator ID1
Nameplate Capacity (MW)83.5
Net Summer Capacity (MW)75
Net Winter Capacity (MW)83.5
TechnologyNatural Gas Fired Combustion Turbine
Energy Source CodeNG
Prime Mover CodeGT
Operating Month6
Operating Year2003
Status(OP) Operating
Latitude31.6004
Longitude-89.9468
Original text(OP) Operating
source_record_idOperating:7973

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:7973

Sources EV-4b6ac3b2c29efdbb0c77c2ed
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 5d62c4a2fd2f7afb1a0fb7ce01eb9346d3f4f1007a34fbed9a713a07da801615

Usage terms US government public domain

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel