POWER & FACILITY EVIDENCE
Power and Facility Evidence Database Review power assets, contract observations, facility specifications and relationships from public sources.
Global Facilities and Power Map Korea Site and Power Map Korea Data Center Database This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 3items · current page 1–3 · Source records, not unique facilities.
Metric or condition Source value Basis, scope and stage Nameplate Capacity (MW) 28 MW Original source column definition · Generator · Canceled or Postponed As-of date 2026-08 Sources EV-6f3a7be875b4bd12b951e5fe Net Summer Capacity (MW) 24 MW Original source column definition · Generator · Canceled or Postponed As-of date 2026-08 Sources EV-6f3a7be875b4bd12b951e5fe Net Winter Capacity (MW) 28 MW Original source column definition · Generator · Canceled or Postponed As-of date 2026-08 Sources EV-6f3a7be875b4bd12b951e5fe
Detailed source fields Original source field Published value or condition Entity ID 13809 Entity Name NorthWestern Energy - (SD) Plant ID 7956 Plant Name Future CT Google Map Map Bing Map Map Plant State SD County Hyde Balancing Authority Code MISO Sector Electric Utility Generator ID 2 Nameplate Capacity (MW) 28 Net Summer Capacity (MW) 24 Net Winter Capacity (MW) 28 Technology Natural Gas Fired Combustion Turbine Energy Source Code NG Prime Mover Code GT Latitude 44.5225 Longitude -99.44111 Original text Canceled or Postponed Coordinate accuracy source_precision_not_independently_surveyed source_record_id Canceled or Postponed:206
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items eia860 ↗ Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Retired and Canceled:3037
Sources EV-298e730d982f2779077012e4 Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba 행 SHA-256 20cfd8ef30face6966ea5a5f1dc250bf05999bc36cf05f32be8332fadf1cdcc3 Usage terms US government public domain
eia860m ↗ Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Canceled or Postponed:206
Sources EV-6f3a7be875b4bd12b951e5fe Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c 행 SHA-256 4bbef81e98d3594dfb166c016fafc072790e1554bd17a42a9aa558bbf79ebb68 Usage terms US government public domain
Observations for this power asset View on the global map Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition Entity ID 13809 Entity Name NorthWestern Energy - (SD) Plant ID 7956 Plant Name Future CT Google Map Map Bing Map Map Plant State SD County Hyde Balancing Authority Code MISO Sector Electric Utility Generator ID 2 Nameplate Capacity (MW) 28 Net Summer Capacity (MW) 24 Net Winter Capacity (MW) 28 Technology Natural Gas Fired Combustion Turbine Energy Source Code NG Prime Mover Code GT Latitude 44.5225 Longitude -99.44111 Original text Canceled or Postponed source_record_id Canceled or Postponed:206
Parent facility or plant record
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items eia860m ↗ Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Canceled or Postponed:206
Sources EV-6f3a7be875b4bd12b951e5fe Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c 행 SHA-256 4bbef81e98d3594dfb166c016fafc072790e1554bd17a42a9aa558bbf79ebb68 Usage terms US government public domain
Observations for this power asset Source snapshots by date · USA · eia860 Future CT / 2 Generator · Cancelled
Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition Utility ID 13809 Utility Name NorthWestern Energy - (SD) Plant Code 7956 Plant Name Future CT State SD County Hyde Generator ID 2 Technology Natural Gas Fired Combustion Turbine Prime Mover GT Ownership S Duct Burners X Can Bypass Heat Recovery Steam Generator? X Nameplate Capacity (MW) 28 Summer Capacity (MW) 24 Winter Capacity (MW) 28 Uprate or Derate Completed During Year N Status CN Synchronized to Transmission Grid X Sector Name Electric Utility Sector 1 Energy Source 1 NG Energy Source 2 DFO Original text CN source_record_id 3_1_Generator_Y2025.xlsx#Retired and Canceled:3037
Parent facility or plant record
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items eia860 ↗ Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Retired and Canceled:3037
Sources EV-298e730d982f2779077012e4 Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba 행 SHA-256 20cfd8ef30face6966ea5a5f1dc250bf05999bc36cf05f32be8332fadf1cdcc3 Usage terms US government public domain
Observations for this power asset