Global Facilities and Power Map Korea Site and Power Map Korea Data Center Database This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 3items · current page 1–3 · Source records, not unique facilities.
Metric or condition Source value Basis, scope and stage Nameplate Capacity (MW) 170 MW Original source column definition · Generator · Canceled or Postponed As-of date 2026-08 Sources EV-7a297fa677fb93d74fde2e08 Net Summer Capacity (MW) 170 MW Original source column definition · Generator · Canceled or Postponed As-of date 2026-08 Sources EV-7a297fa677fb93d74fde2e08 Net Winter Capacity (MW) 170 MW Original source column definition · Generator · Canceled or Postponed As-of date 2026-08 Sources EV-7a297fa677fb93d74fde2e08
Detailed source fields Original source field Published value or condition Entity ID 18642 Entity Name Tennessee Valley Authority Plant ID 7950 Plant Name Franklin (TN) Google Map Map Bing Map Map Plant State TN County Franklin Balancing Authority Code TVA Sector Electric Utility Generator ID 2 Nameplate Capacity (MW) 170 Net Summer Capacity (MW) 170 Net Winter Capacity (MW) 170 Technology Natural Gas Fired Combined Cycle Energy Source Code NG Prime Mover Code CC Latitude 35.270556 Longitude -86.13944 Original text Canceled or Postponed Coordinate accuracy source_precision_not_independently_surveyed source_record_id Canceled or Postponed:203
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items eia860 ↗ Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Retired and Canceled:3026
Sources EV-64c9fb0f660842719818ec22 Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba 행 SHA-256 be72d4f87e1d3b899d5c9b36ae46b891fca0e41a9f04bcf10e5486b2266a396e Usage terms US government public domain
eia860m ↗ Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Canceled or Postponed:203
Sources EV-7a297fa677fb93d74fde2e08 Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c 행 SHA-256 100cacedc60dd74e1ab4d5eaa5d4588bcdf127feaa59f60db1bc8abe305a4830 Usage terms US government public domain
Observations for this power asset View on the global map Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition Entity ID 18642 Entity Name Tennessee Valley Authority Plant ID 7950 Plant Name Franklin (TN) Google Map Map Bing Map Map Plant State TN County Franklin Balancing Authority Code TVA Sector Electric Utility Generator ID 2 Nameplate Capacity (MW) 170 Net Summer Capacity (MW) 170 Net Winter Capacity (MW) 170 Technology Natural Gas Fired Combined Cycle Energy Source Code NG Prime Mover Code CC Latitude 35.270556 Longitude -86.13944 Original text Canceled or Postponed source_record_id Canceled or Postponed:203
Parent facility or plant record
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items eia860m ↗ Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Canceled or Postponed:203
Sources EV-7a297fa677fb93d74fde2e08 Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c 행 SHA-256 100cacedc60dd74e1ab4d5eaa5d4588bcdf127feaa59f60db1bc8abe305a4830 Usage terms US government public domain
Observations for this power asset Source snapshots by date · USA · eia860 Franklin (TN) / 2 Generator · Cancelled
Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition Utility ID 18642 Utility Name Tennessee Valley Authority Plant Code 7950 Plant Name Franklin (TN) State TN County Franklin Generator ID 2 Technology Natural Gas Fired Combined Cycle Prime Mover CC Ownership S Duct Burners N Can Bypass Heat Recovery Steam Generator? N Nameplate Capacity (MW) 170 Summer Capacity (MW) 170 Winter Capacity (MW) 170 Uprate or Derate Completed During Year N Status CN Synchronized to Transmission Grid X Associated with Combined Heat and Power System N Sector Name Electric Utility Sector 1 Topping or Bottoming X Energy Source 1 NG Original text CN source_record_id 3_1_Generator_Y2025.xlsx#Retired and Canceled:3026
Parent facility or plant record
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items eia860 ↗ Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Retired and Canceled:3026
Sources EV-64c9fb0f660842719818ec22 Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba 행 SHA-256 be72d4f87e1d3b899d5c9b36ae46b891fca0e41a9f04bcf10e5486b2266a396e Usage terms US government public domain