Power assets and projects · USA · eia860m

Black Bear Lake / 1

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)4.5 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-81c230f5810fb935c6258bc3
Net Summer Capacity (MW)4 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-81c230f5810fb935c6258bc3
Net Winter Capacity (MW)4 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-81c230f5810fb935c6258bc3
Detailed source fields
Original source fieldPublished value or condition
Entity ID219
Entity NameAlaska Power and Telephone Co
Plant ID7752
Plant NameBlack Bear Lake
Google MapMap
Bing MapMap
Plant StateAK
CountyPrince of Wales Ketchikan
SectorElectric Utility
Generator ID1
Nameplate Capacity (MW)4.5
Net Summer Capacity (MW)4
Net Winter Capacity (MW)4
TechnologyConventional Hydroelectric
Energy Source CodeWAT
Prime Mover CodeHY
Operating Month3
Operating Year1995
Status(OP) Operating
Latitude55.476472
Longitude-133.1477
Original text(OP) Operating
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idOperating:7480

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:7478

Sources EV-364d89f00dbab4fd143b2efb
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 7ca018141d371825547162429f45ead08019f301e9f3323b47b9817a61629955

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:7480

Sources EV-81c230f5810fb935c6258bc3
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 c73e7693b263f5fb91860e72e2777161b9bfe94533b67ebbf96f440771dd652e

Usage terms US government public domain

Source snapshots by date · USA · eia860

Black Bear Lake / 1

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Utility ID219
Utility NameAlaska Power and Telephone Co
Plant Code7752
Plant NameBlack Bear Lake
StateAK
CountyPrince of Wales Ketchikan
Generator ID1
TechnologyConventional Hydroelectric
Prime MoverHY
OwnershipS
Duct BurnersX
Can Bypass Heat Recovery Steam Generator?X
Nameplate Capacity (MW)4.5
Nameplate Power Factor0.8
Summer Capacity (MW)4
Winter Capacity (MW)4
Minimum Load (MW)0.1
Uprate or Derate Completed During YearN
StatusOP
Synchronized to Transmission GridX
Operating Month3
Operating Year1995
Associated with Combined Heat and Power SystemN
Sector NameElectric Utility
Sector1
Topping or BottomingX
Energy Source 1WAT
Solid Fuel Gasification System?N
Carbon Capture Technology?N
Time from Cold Shutdown to Full Load1H
Multiple Fuels?N
Original textOP
source_record_id3_1_Generator_Y2025.xlsx#Operable:7478

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:7478

Sources EV-364d89f00dbab4fd143b2efb
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 7ca018141d371825547162429f45ead08019f301e9f3323b47b9817a61629955

Usage terms US government public domain

Source snapshots by date · USA · eia860m

Black Bear Lake / 1

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Entity ID219
Entity NameAlaska Power and Telephone Co
Plant ID7752
Plant NameBlack Bear Lake
Google MapMap
Bing MapMap
Plant StateAK
CountyPrince of Wales Ketchikan
SectorElectric Utility
Generator ID1
Nameplate Capacity (MW)4.5
Net Summer Capacity (MW)4
Net Winter Capacity (MW)4
TechnologyConventional Hydroelectric
Energy Source CodeWAT
Prime Mover CodeHY
Operating Month3
Operating Year1995
Status(OP) Operating
Latitude55.476472
Longitude-133.1477
Original text(OP) Operating
source_record_idOperating:7480

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:7480

Sources EV-81c230f5810fb935c6258bc3
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 c73e7693b263f5fb91860e72e2777161b9bfe94533b67ebbf96f440771dd652e

Usage terms US government public domain

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel