Global Facilities and Power Map Korea Site and Power Map Korea Data Center Database This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 3items · current page 1–3 · Source records, not unique facilities.
Metric or condition Source value Basis, scope and stage Nameplate Capacity (MW) 300 MW Original source column definition · Generator · Canceled or Postponed As-of date 2026-08 Sources EV-7f29ef7830fb76476e0fc9d7 Net Summer Capacity (MW) 300 MW Original source column definition · Generator · Canceled or Postponed As-of date 2026-08 Sources EV-7f29ef7830fb76476e0fc9d7 Net Winter Capacity (MW) 300 MW Original source column definition · Generator · Canceled or Postponed As-of date 2026-08 Sources EV-7f29ef7830fb76476e0fc9d7
Detailed source fields Original source field Published value or condition Entity ID 21554 Entity Name Seminole Electric Cooperative Inc Plant ID 7738 Plant Name Unknown Google Map Map Bing Map Map Plant State FL County Hardee Sector Electric Utility Generator ID 1 Nameplate Capacity (MW) 300 Net Summer Capacity (MW) 300 Net Winter Capacity (MW) 300 Technology Petroleum Liquids Energy Source Code DFO Prime Mover Code GT Latitude 27.627778 Longitude -81.845 Original text Canceled or Postponed Coordinate accuracy source_precision_not_independently_surveyed source_record_id Canceled or Postponed:142
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items eia860 ↗ Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Retired and Canceled:2938
Sources EV-0671cd9ba9458fbdd5a65e0a Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba 행 SHA-256 7e27642dd4ccbc6badb10899dde3bdd4361cba6121ad2e8af55c06ab34284cb6 Usage terms US government public domain
eia860m ↗ Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Canceled or Postponed:142
Sources EV-7f29ef7830fb76476e0fc9d7 Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c 행 SHA-256 7b598f8e24b841349ef85bdbaa4282e185042f4f91d504a07d07c5242a477145 Usage terms US government public domain
Observations for this power asset View on the global map Source snapshots by date · USA · eia860 Unknown / 1 Generator · Cancelled
Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition Utility ID 21554 Utility Name Seminole Electric Cooperative Inc Plant Code 7738 Plant Name Unknown State FL County Hardee Generator ID 1 Technology Petroleum Liquids Prime Mover GT Ownership S Duct Burners X Can Bypass Heat Recovery Steam Generator? X Nameplate Capacity (MW) 300 Summer Capacity (MW) 300 Winter Capacity (MW) 300 Uprate or Derate Completed During Year N Status CN Synchronized to Transmission Grid X Sector Name Electric Utility Sector 1 Energy Source 1 DFO Original text CN source_record_id 3_1_Generator_Y2025.xlsx#Retired and Canceled:2938
Parent facility or plant record
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items eia860 ↗ Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Retired and Canceled:2938
Sources EV-0671cd9ba9458fbdd5a65e0a Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba 행 SHA-256 7e27642dd4ccbc6badb10899dde3bdd4361cba6121ad2e8af55c06ab34284cb6 Usage terms US government public domain
Observations for this power asset Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition Entity ID 21554 Entity Name Seminole Electric Cooperative Inc Plant ID 7738 Plant Name Unknown Google Map Map Bing Map Map Plant State FL County Hardee Sector Electric Utility Generator ID 1 Nameplate Capacity (MW) 300 Net Summer Capacity (MW) 300 Net Winter Capacity (MW) 300 Technology Petroleum Liquids Energy Source Code DFO Prime Mover Code GT Latitude 27.627778 Longitude -81.845 Original text Canceled or Postponed source_record_id Canceled or Postponed:142
Parent facility or plant record
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items eia860m ↗ Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Canceled or Postponed:142
Sources EV-7f29ef7830fb76476e0fc9d7 Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c 행 SHA-256 7b598f8e24b841349ef85bdbaa4282e185042f4f91d504a07d07c5242a477145 Usage terms US government public domain
Observations for this power asset