Power assets and projects · USA · eia860m

GPC4 / 1

Generator · Cancelled or postponed

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)570 MWOriginal source column definition · Generator · Canceled or Postponed
As-of date 2026-08
Sources EV-7e93456a2e43e76f5acbda01
Net Summer Capacity (MW)570 MWOriginal source column definition · Generator · Canceled or Postponed
As-of date 2026-08
Sources EV-7e93456a2e43e76f5acbda01
Net Winter Capacity (MW)570 MWOriginal source column definition · Generator · Canceled or Postponed
As-of date 2026-08
Sources EV-7e93456a2e43e76f5acbda01
Detailed source fields
Original source fieldPublished value or condition
Entity ID7140
Entity NameGeorgia Power Co
Plant ID7712
Plant NameGPC4
Plant StateGA
SectorElectric Utility
Generator ID1
Nameplate Capacity (MW)570
Net Summer Capacity (MW)570
Net Winter Capacity (MW)570
TechnologyNatural Gas Fired Combustion Turbine
Energy Source CodeNG
Prime Mover CodeGT
Original textCanceled or Postponed
source_record_idCanceled or Postponed:136

Parent facility or plant record

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Retired and Canceled:2931

Sources EV-7c7449017d0efb2628645384
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 31fd522de28fbe458f4ea85c1deeac76baf316248f69ccd49011e54ace770716

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Canceled or Postponed:136

Sources EV-7e93456a2e43e76f5acbda01
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 57ce65fd62f221432654b73fc1320813a9b5625f41d2c46166c442f41b0ca64e

Usage terms US government public domain

Source snapshots by date · USA · eia860

GPC4 / 1

Generator · Cancelled

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Utility ID7140
Utility NameGeorgia Power Co
Plant Code7712
Plant NameGPC4
StateGA
Generator ID1
TechnologyNatural Gas Fired Combustion Turbine
Prime MoverGT
OwnershipS
Duct BurnersX
Can Bypass Heat Recovery Steam Generator?X
Nameplate Capacity (MW)570
Summer Capacity (MW)570
Winter Capacity (MW)570
Uprate or Derate Completed During YearN
StatusCN
Synchronized to Transmission GridX
Associated with Combined Heat and Power SystemN
Sector NameElectric Utility
Sector1
Topping or BottomingX
Energy Source 1NG
Original textCN
source_record_id3_1_Generator_Y2025.xlsx#Retired and Canceled:2931

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Retired and Canceled:2931

Sources EV-7c7449017d0efb2628645384
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 31fd522de28fbe458f4ea85c1deeac76baf316248f69ccd49011e54ace770716

Usage terms US government public domain

Source snapshots by date · USA · eia860m

GPC4 / 1

Generator · Cancelled or postponed

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Entity ID7140
Entity NameGeorgia Power Co
Plant ID7712
Plant NameGPC4
Plant StateGA
SectorElectric Utility
Generator ID1
Nameplate Capacity (MW)570
Net Summer Capacity (MW)570
Net Winter Capacity (MW)570
TechnologyNatural Gas Fired Combustion Turbine
Energy Source CodeNG
Prime Mover CodeGT
Original textCanceled or Postponed
source_record_idCanceled or Postponed:136

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Canceled or Postponed:136

Sources EV-7e93456a2e43e76f5acbda01
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 57ce65fd62f221432654b73fc1320813a9b5625f41d2c46166c442f41b0ca64e

Usage terms US government public domain

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel