Belleville Dam / 1

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)21 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-c9fb5938ea722bd66a63b4bb
Net Summer Capacity (MW)21 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-c9fb5938ea722bd66a63b4bb
Net Winter Capacity (MW)21 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-c9fb5938ea722bd66a63b4bb
Detailed source fields
Original source fieldPublished value or condition
Entity ID40577
Entity NameAmerican Mun Power-Ohio, Inc
Plant ID7594
Plant NameBelleville Dam
Google MapMap
Bing MapMap
Plant StateWV
CountyWood
Balancing Authority CodePJM
SectorElectric Utility
Generator ID1
Nameplate Capacity (MW)21
Net Summer Capacity (MW)21
Net Winter Capacity (MW)21
TechnologyConventional Hydroelectric
Energy Source CodeWAT
Prime Mover CodeHY
Operating Month6
Operating Year1999
Status(OP) Operating
Latitude39.1192
Longitude-81.7375
Original text(OP) Operating
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idOperating:7417

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:7415

Sources EV-ae6ebb0722f7fb828bcd082b
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 43fca90267ee53c78b4d016dfb1ad77cf9a53cb1d4e4afc134f958858d5358de

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:7417

Sources EV-c9fb5938ea722bd66a63b4bb
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 ffa9ace2accf601d574b477b4e2c289bdf3374fe49ea3f7307a0b6597d15dcbf

Usage terms US government public domain

Source snapshots by date · USA · eia860m

Belleville Dam / 1

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Entity ID40577
Entity NameAmerican Mun Power-Ohio, Inc
Plant ID7594
Plant NameBelleville Dam
Google MapMap
Bing MapMap
Plant StateWV
CountyWood
Balancing Authority CodePJM
SectorElectric Utility
Generator ID1
Nameplate Capacity (MW)21
Net Summer Capacity (MW)21
Net Winter Capacity (MW)21
TechnologyConventional Hydroelectric
Energy Source CodeWAT
Prime Mover CodeHY
Operating Month6
Operating Year1999
Status(OP) Operating
Latitude39.1192
Longitude-81.7375
Original text(OP) Operating
source_record_idOperating:7417

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:7417

Sources EV-c9fb5938ea722bd66a63b4bb
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 ffa9ace2accf601d574b477b4e2c289bdf3374fe49ea3f7307a0b6597d15dcbf

Usage terms US government public domain

Source snapshots by date · USA · eia860

Belleville Dam / 1

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Utility ID40577
Utility NameAmerican Mun Power-Ohio, Inc
Plant Code7594
Plant NameBelleville Dam
StateWV
CountyWood
Generator ID1
TechnologyConventional Hydroelectric
Prime MoverHY
OwnershipJ
Duct BurnersX
Can Bypass Heat Recovery Steam Generator?X
RTO/ISO LMP Node DesignationBELLEV12
RTO/ISO Location Designation for Reporting Wholesale Sales Data to FERCBELLEV12
Nameplate Capacity (MW)21
Nameplate Power Factor0.9
Summer Capacity (MW)21
Winter Capacity (MW)21
Minimum Load (MW)3
Uprate or Derate Completed During YearN
StatusOP
Synchronized to Transmission GridX
Operating Month6
Operating Year1999
Associated with Combined Heat and Power SystemN
Sector NameElectric Utility
Sector1
Topping or BottomingX
Energy Source 1WAT
Solid Fuel Gasification System?N
Carbon Capture Technology?N
Turbines or Hydrokinetic Buoys0
Time from Cold Shutdown to Full Load10M
Multiple Fuels?N
Original textOP
source_record_id3_1_Generator_Y2025.xlsx#Operable:7415

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:7415

Sources EV-ae6ebb0722f7fb828bcd082b
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 43fca90267ee53c78b4d016dfb1ad77cf9a53cb1d4e4afc134f958858d5358de

Usage terms US government public domain

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel