Power assets and projects · USA · eia860m

Stevens Creek / 7

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)2.2 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-c52204f2e8257fab64ab83ca
Net Summer Capacity (MW)1.5 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-c52204f2e8257fab64ab83ca
Net Winter Capacity (MW)1.9 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-c52204f2e8257fab64ab83ca
Detailed source fields
Original source fieldPublished value or condition
Entity ID17539
Entity NameDominion Energy South Carolina, Inc
Plant ID736
Plant NameStevens Creek
Google MapMap
Bing MapMap
Plant StateGA
CountyColumbia
Balancing Authority CodeSCEG
SectorElectric Utility
Generator ID7
Nameplate Capacity (MW)2.2
Net Summer Capacity (MW)1.5
Net Winter Capacity (MW)1.9
TechnologyConventional Hydroelectric
Energy Source CodeWAT
Prime Mover CodeHY
Operating Month6
Operating Year1926
Status(OP) Operating
Latitude33.562644
Longitude-82.05124
Original text(OP) Operating
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idOperating:1261

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:1255

Sources EV-1c34f81d6edabf7c2a14e7aa
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 e29c7f12ce8bdc5739f272e6888c6d83e3b8dd8ab7e738bf2956f99777ddfab8

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:1261

Sources EV-c52204f2e8257fab64ab83ca
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 7c476792f42f5ad182e2a7d3fb271d616fad030f31847b1fd879b70096aea1a5

Usage terms US government public domain

Source snapshots by date · USA · eia860

Stevens Creek / 7

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Utility ID17539
Utility NameDominion Energy South Carolina, Inc
Plant Code736
Plant NameStevens Creek
StateGA
CountyColumbia
Generator ID7
TechnologyConventional Hydroelectric
Prime MoverHY
OwnershipS
Duct BurnersX
Can Bypass Heat Recovery Steam Generator?X
Nameplate Capacity (MW)2.2
Nameplate Power Factor0.8
Summer Capacity (MW)1.5
Winter Capacity (MW)1.9
Minimum Load (MW)0.1
Uprate or Derate Completed During YearN
StatusOP
Synchronized to Transmission GridX
Operating Month6
Operating Year1926
Associated with Combined Heat and Power SystemN
Sector NameElectric Utility
Sector1
Topping or BottomingX
Energy Source 1WAT
Solid Fuel Gasification System?N
Carbon Capture Technology?N
Turbines or Hydrokinetic Buoys0
Time from Cold Shutdown to Full Load1H
Multiple Fuels?N
Original textOP
source_record_id3_1_Generator_Y2025.xlsx#Operable:1255

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:1255

Sources EV-1c34f81d6edabf7c2a14e7aa
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 e29c7f12ce8bdc5739f272e6888c6d83e3b8dd8ab7e738bf2956f99777ddfab8

Usage terms US government public domain

Source snapshots by date · USA · eia860m

Stevens Creek / 7

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Entity ID17539
Entity NameDominion Energy South Carolina, Inc
Plant ID736
Plant NameStevens Creek
Google MapMap
Bing MapMap
Plant StateGA
CountyColumbia
Balancing Authority CodeSCEG
SectorElectric Utility
Generator ID7
Nameplate Capacity (MW)2.2
Net Summer Capacity (MW)1.5
Net Winter Capacity (MW)1.9
TechnologyConventional Hydroelectric
Energy Source CodeWAT
Prime Mover CodeHY
Operating Month6
Operating Year1926
Status(OP) Operating
Latitude33.562644
Longitude-82.05124
Original text(OP) Operating
source_record_idOperating:1261

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:1261

Sources EV-c52204f2e8257fab64ab83ca
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 7c476792f42f5ad182e2a7d3fb271d616fad030f31847b1fd879b70096aea1a5

Usage terms US government public domain

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel