Power assets and projects · USA · eia860m

Jack McDonough / 6BCT

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)276.3 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-6bd9772761fcf20a9226d35a
Net Summer Capacity (MW)233 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-6bd9772761fcf20a9226d35a
Net Winter Capacity (MW)274.5 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-6bd9772761fcf20a9226d35a
Detailed source fields
Original source fieldPublished value or condition
Entity ID7140
Entity NameGeorgia Power Co
Plant ID710
Plant NameJack McDonough
Google MapMap
Bing MapMap
Plant StateGA
CountyCobb
Balancing Authority CodeSOCO
SectorElectric Utility
Generator ID6BCT
Unit CodeG106
Nameplate Capacity (MW)276.3
Net Summer Capacity (MW)233
Net Winter Capacity (MW)274.5
TechnologyNatural Gas Fired Combined Cycle
Energy Source CodeNG
Prime Mover CodeCT
Operating Month10
Operating Year2012
Status(OP) Operating
Latitude33.8239
Longitude-84.4758
Original text(OP) Operating
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idOperating:1199

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:1193

Sources EV-7f5c2818f835cd023e881bb6
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 d16563206a27c9bc3f0b7d152725521f924ad5317a5effe51f4fa93a40ddf1a6

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:1199

Sources EV-6bd9772761fcf20a9226d35a
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 0635739fa1ca3230fa17d944f27a7803be99e5c171bd889fbc92ff6366543cf9

Usage terms US government public domain

Source snapshots by date · USA · eia860

Jack McDonough / 6BCT

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Utility ID7140
Utility NameGeorgia Power Co
Plant Code710
Plant NameJack McDonough
StateGA
CountyCobb
Generator ID6BCT
TechnologyNatural Gas Fired Combined Cycle
Prime MoverCT
Unit CodeG106
OwnershipS
Duct BurnersX
Can Bypass Heat Recovery Steam Generator?N
Nameplate Capacity (MW)276.3
Nameplate Power Factor0.85
Summer Capacity (MW)233
Winter Capacity (MW)274.5
Minimum Load (MW)150
Uprate or Derate Completed During YearN
StatusOP
Synchronized to Transmission GridX
Operating Month10
Operating Year2012
Associated with Combined Heat and Power SystemN
Sector NameElectric Utility
Sector1
Topping or BottomingX
Energy Source 1NG
Solid Fuel Gasification System?N
Time from Cold Shutdown to Full Load12H
Multiple Fuels?N
Cofire Fuels?N
Switch Between Oil and Natural Gas?N
Original textOP
source_record_id3_1_Generator_Y2025.xlsx#Operable:1193

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:1193

Sources EV-7f5c2818f835cd023e881bb6
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 d16563206a27c9bc3f0b7d152725521f924ad5317a5effe51f4fa93a40ddf1a6

Usage terms US government public domain

Source snapshots by date · USA · eia860m

Jack McDonough / 6BCT

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Entity ID7140
Entity NameGeorgia Power Co
Plant ID710
Plant NameJack McDonough
Google MapMap
Bing MapMap
Plant StateGA
CountyCobb
Balancing Authority CodeSOCO
SectorElectric Utility
Generator ID6BCT
Unit CodeG106
Nameplate Capacity (MW)276.3
Net Summer Capacity (MW)233
Net Winter Capacity (MW)274.5
TechnologyNatural Gas Fired Combined Cycle
Energy Source CodeNG
Prime Mover CodeCT
Operating Month10
Operating Year2012
Status(OP) Operating
Latitude33.8239
Longitude-84.4758
Original text(OP) Operating
source_record_idOperating:1199

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:1199

Sources EV-6bd9772761fcf20a9226d35a
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 0635739fa1ca3230fa17d944f27a7803be99e5c171bd889fbc92ff6366543cf9

Usage terms US government public domain

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel