Burton Dam / 1

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)3 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-c00a7a859e6d08dcfd1f0a20
Net Summer Capacity (MW)4.8 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-c00a7a859e6d08dcfd1f0a20
Net Winter Capacity (MW)4.4 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-c00a7a859e6d08dcfd1f0a20
Detailed source fields
Original source fieldPublished value or condition
Entity ID7140
Entity NameGeorgia Power Co
Plant ID704
Plant NameBurton Dam
Google MapMap
Bing MapMap
Plant StateGA
CountyRabun
Balancing Authority CodeSOCO
SectorElectric Utility
Generator ID1
Nameplate Capacity (MW)3
Net Summer Capacity (MW)4.8
Net Winter Capacity (MW)4.4
TechnologyConventional Hydroelectric
Energy Source CodeWAT
Prime Mover CodeHY
Operating Month9
Operating Year1927
Status(OP) Operating
Latitude34.7939
Longitude-83.5402
Original text(OP) Operating
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idOperating:1180

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:1174

Sources EV-83d9134acc361d807ddf99c3
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 21c35f0fca6d269eb7cd12d2d7a866eac6ae60bf7a4c94b98c11bd47ba44b43f

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:1180

Sources EV-c00a7a859e6d08dcfd1f0a20
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 7852b03bc9d35880d11f93ef3251351d94a36555778684c43050ebd9ffe17d5e

Usage terms US government public domain

Source snapshots by date · USA · eia860

Burton Dam / 1

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Utility ID7140
Utility NameGeorgia Power Co
Plant Code704
Plant NameBurton Dam
StateGA
CountyRabun
Generator ID1
TechnologyConventional Hydroelectric
Prime MoverHY
OwnershipS
Duct BurnersX
Can Bypass Heat Recovery Steam Generator?X
Nameplate Capacity (MW)3
Nameplate Power Factor0.9
Summer Capacity (MW)4.8
Winter Capacity (MW)4.4
Minimum Load (MW)4.4
Uprate or Derate Completed During YearN
StatusOP
Synchronized to Transmission GridX
Operating Month9
Operating Year1927
Associated with Combined Heat and Power SystemN
Sector NameElectric Utility
Sector1
Topping or BottomingX
Energy Source 1WAT
Solid Fuel Gasification System?N
Turbines or Hydrokinetic Buoys0
Time from Cold Shutdown to Full Load1H
Multiple Fuels?N
Original textOP
source_record_id3_1_Generator_Y2025.xlsx#Operable:1174

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:1174

Sources EV-83d9134acc361d807ddf99c3
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 21c35f0fca6d269eb7cd12d2d7a866eac6ae60bf7a4c94b98c11bd47ba44b43f

Usage terms US government public domain

Source snapshots by date · USA · eia860m

Burton Dam / 1

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Entity ID7140
Entity NameGeorgia Power Co
Plant ID704
Plant NameBurton Dam
Google MapMap
Bing MapMap
Plant StateGA
CountyRabun
Balancing Authority CodeSOCO
SectorElectric Utility
Generator ID1
Nameplate Capacity (MW)3
Net Summer Capacity (MW)4.8
Net Winter Capacity (MW)4.4
TechnologyConventional Hydroelectric
Energy Source CodeWAT
Prime Mover CodeHY
Operating Month9
Operating Year1927
Status(OP) Operating
Latitude34.7939
Longitude-83.5402
Original text(OP) Operating
source_record_idOperating:1180

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:1180

Sources EV-c00a7a859e6d08dcfd1f0a20
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 7852b03bc9d35880d11f93ef3251351d94a36555778684c43050ebd9ffe17d5e

Usage terms US government public domain

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel