Review power assets, contract observations, facility specifications and relationships from public sources.
This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 3items · current page 1–3 · Source records, not unique facilities.
Power assets and projects · USA · eia860m
Pace Road Battery Storage / BESS1
Generator · Plan
Metric or condition
Source value
Basis, scope and stage
Nameplate Capacity (MW)
20 MW
Original source column definition · Generator · (T) Regulatory approvals received. Not under construction As-of date 2026-08 Sources EV-653214390ff3f3567674309d
Net Summer Capacity (MW)
20 MW
Original source column definition · Generator · (T) Regulatory approvals received. Not under construction As-of date 2026-08 Sources EV-653214390ff3f3567674309d
Net Winter Capacity (MW)
20 MW
Original source column definition · Generator · (T) Regulatory approvals received. Not under construction As-of date 2026-08 Sources EV-653214390ff3f3567674309d
Detailed source fields
Original source field
Published value or condition
Entity ID
18454
Entity Name
Tampa Electric Co
Plant ID
70395
Plant Name
Pace Road Battery Storage
Google Map
Map
Bing Map
Map
Plant State
FL
County
Polk
Balancing Authority Code
TEC
Sector
Electric Utility
Generator ID
BESS1
Nameplate Capacity (MW)
20
Net Summer Capacity (MW)
20
Net Winter Capacity (MW)
20
Technology
Batteries
Energy Source Code
MWH
Prime Mover Code
BA
Planned Operation Month
10
Planned Operation Year
2027
Status
(T) Regulatory approvals received. Not under construction
Latitude
28.136235
Longitude
-81.82978
Original text
(T) Regulatory approvals received. Not under construction