Global Facilities and Power Map Korea Site and Power Map Korea Data Center Database This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 3items · current page 1–3 · Source records, not unique facilities.
Power assets and projects · USA · eia860m Gravel Neck / 2 Generator · Operations
Metric or condition Source value Basis, scope and stage Nameplate Capacity (MW) 23.8 MW Original source column definition · Generator · (OP) Operating As-of date 2026-08 Sources EV-b24f27db753e016969ee60ec Net Summer Capacity (MW) 16 MW Original source column definition · Generator · (OP) Operating As-of date 2026-08 Sources EV-b24f27db753e016969ee60ec Net Winter Capacity (MW) 25.7 MW Original source column definition · Generator · (OP) Operating As-of date 2026-08 Sources EV-b24f27db753e016969ee60ec
Detailed source fields Original source field Published value or condition Entity ID 19876 Entity Name Virginia Electric & Power Co Plant ID 7032 Plant Name Gravel Neck Google Map Map Bing Map Map Plant State VA County Surry Balancing Authority Code PJM Sector Electric Utility Generator ID 2 Nameplate Capacity (MW) 23.8 Net Summer Capacity (MW) 16 Net Winter Capacity (MW) 25.7 Technology Petroleum Liquids Energy Source Code DFO Prime Mover Code GT Operating Month 12 Operating Year 1970 Status (OP) Operating Latitude 37.1575 Longitude -76.6911 Original text (OP) Operating Coordinate accuracy source_precision_not_independently_surveyed source_record_id Operating:6893
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items eia860 ↗ Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Operable:6897
Sources EV-4a2f04ab2d180d8fd66bd2e8 Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba 행 SHA-256 8e65b5c1564c64f42ae3355a10641237ff30feae4dd95605be68871dcc4a0f41 Usage terms US government public domain
eia860m ↗ Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Operating:6893
Sources EV-b24f27db753e016969ee60ec Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c 행 SHA-256 285fef7dcf3e123bbff75b3558abffa18eca491d5aaf65754dc7bf438e49ab75 Usage terms US government public domain
Observations for this power asset View on the global map Source snapshots by date · USA · eia860m Gravel Neck / 2 Generator · Operations
Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition Entity ID 19876 Entity Name Virginia Electric & Power Co Plant ID 7032 Plant Name Gravel Neck Google Map Map Bing Map Map Plant State VA County Surry Balancing Authority Code PJM Sector Electric Utility Generator ID 2 Nameplate Capacity (MW) 23.8 Net Summer Capacity (MW) 16 Net Winter Capacity (MW) 25.7 Technology Petroleum Liquids Energy Source Code DFO Prime Mover Code GT Operating Month 12 Operating Year 1970 Status (OP) Operating Latitude 37.1575 Longitude -76.6911 Original text (OP) Operating source_record_id Operating:6893
Parent facility or plant record
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items eia860m ↗ Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Operating:6893
Sources EV-b24f27db753e016969ee60ec Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c 행 SHA-256 285fef7dcf3e123bbff75b3558abffa18eca491d5aaf65754dc7bf438e49ab75 Usage terms US government public domain
Observations for this power asset Source snapshots by date · USA · eia860 Gravel Neck / 2 Generator · Operations
Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition Utility ID 19876 Utility Name Virginia Electric & Power Co Plant Code 7032 Plant Name Gravel Neck State VA County Surry Generator ID 2 Technology Petroleum Liquids Prime Mover GT Ownership S Duct Burners X Can Bypass Heat Recovery Steam Generator? X Nameplate Capacity (MW) 23.8 Nameplate Power Factor 0.85 Summer Capacity (MW) 16 Winter Capacity (MW) 25.7 Minimum Load (MW) 3 Uprate or Derate Completed During Year N Status OP Synchronized to Transmission Grid X Operating Month 12 Operating Year 1970 Associated with Combined Heat and Power System N Sector Name Electric Utility Sector 1 Topping or Bottoming X Energy Source 1 DFO Solid Fuel Gasification System? N Time from Cold Shutdown to Full Load 1H Multiple Fuels? N Original text OP source_record_id 3_1_Generator_Y2025.xlsx#Operable:6897
Parent facility or plant record
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items eia860 ↗ Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Operable:6897
Sources EV-4a2f04ab2d180d8fd66bd2e8 Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba 행 SHA-256 8e65b5c1564c64f42ae3355a10641237ff30feae4dd95605be68871dcc4a0f41 Usage terms US government public domain
Observations for this power asset