POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Power assets and projects · USA · eia860m

NL IL Lake / LAKE

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)5 MWOriginal source column definition · Generator · (TS) Construction complete, but not yet in commercial operation
As-of date 2026-08
Sources EV-ceb003652639b44208191b28
Net Summer Capacity (MW)5 MWOriginal source column definition · Generator · (TS) Construction complete, but not yet in commercial operation
As-of date 2026-08
Sources EV-ceb003652639b44208191b28
Net Winter Capacity (MW)5 MWOriginal source column definition · Generator · (TS) Construction complete, but not yet in commercial operation
As-of date 2026-08
Sources EV-ceb003652639b44208191b28
Detailed source fields
Original source fieldPublished value or condition
Entity ID60531
Entity NameStandard Solar
Plant ID70295
Plant NameNL IL Lake
Google MapMap
Bing MapMap
Plant StateIL
CountyLake
Balancing Authority CodePJM
SectorIPP Non-CHP
Generator IDLAKE
Nameplate Capacity (MW)5
Net Summer Capacity (MW)5
Net Winter Capacity (MW)5
TechnologySolar Photovoltaic
Energy Source CodeSUN
Prime Mover CodePV
Planned Operation Month12
Planned Operation Year2026
Status(TS) Construction complete, but not yet in commercial operation
Latitude42.464881
Longitude-87.88974
Original text(TS) Construction complete, but not yet in commercial operation
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idPlanned:592

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Proposed:2714

Sources EV-4e464dc2378308033f59c3c0
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 23a8ffa890a0f3261b36c83f7d9dd5b1850a22100e07cc4658bcaa23de6bf22c

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Planned:592

Sources EV-ceb003652639b44208191b28
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 660cd80bca826a1317845a6bf6c3776b420d3348faac18b40cb972c5df952fb2

Usage terms US government public domain

Source snapshots by date · USA · eia860m

NL IL Lake / LAKE

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Entity ID60531
Entity NameStandard Solar
Plant ID70295
Plant NameNL IL Lake
Google MapMap
Bing MapMap
Plant StateIL
CountyLake
Balancing Authority CodePJM
SectorIPP Non-CHP
Generator IDLAKE
Nameplate Capacity (MW)5
Net Summer Capacity (MW)5
Net Winter Capacity (MW)5
TechnologySolar Photovoltaic
Energy Source CodeSUN
Prime Mover CodePV
Planned Operation Month12
Planned Operation Year2026
Status(TS) Construction complete, but not yet in commercial operation
Latitude42.464881
Longitude-87.88974
Original text(TS) Construction complete, but not yet in commercial operation
source_record_idPlanned:592

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Planned:592

Sources EV-ceb003652639b44208191b28
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 660cd80bca826a1317845a6bf6c3776b420d3348faac18b40cb972c5df952fb2

Usage terms US government public domain

Source snapshots by date · USA · eia860

NL IL Lake / LAKE

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Utility ID60531
Utility NameStandard Solar
Plant Code70295
Plant NameNL IL Lake
StateIL
CountyLake
Generator IDLAKE
TechnologySolar Photovoltaic
Prime MoverPV
OwnershipS
Duct BurnersX
Can Bypass Heat Recovery Steam Generator?X
Nameplate Capacity (MW)5
Summer Capacity (MW)5
Winter Capacity (MW)5
StatusTS
Effective Month7
Effective Year2025
Current Month12
Current Year2026
Sector NameIPP Non-CHP
Sector2
Previously CanceledN
Energy Source 1SUN
Original textTS
source_record_id3_1_Generator_Y2025.xlsx#Proposed:2714

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Proposed:2714

Sources EV-4e464dc2378308033f59c3c0
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 23a8ffa890a0f3261b36c83f7d9dd5b1850a22100e07cc4658bcaa23de6bf22c

Usage terms US government public domain

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel