Power assets and projects · USA · eia860m

Shutler Energy Storage / SES

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)41 MWOriginal source column definition · Generator · (U) Under construction, less than or equal to 50 percent complete
As-of date 2026-08
Sources EV-a19abb9b57ba268fc31864da
Net Summer Capacity (MW)41 MWOriginal source column definition · Generator · (U) Under construction, less than or equal to 50 percent complete
As-of date 2026-08
Sources EV-a19abb9b57ba268fc31864da
Net Winter Capacity (MW)41 MWOriginal source column definition · Generator · (U) Under construction, less than or equal to 50 percent complete
As-of date 2026-08
Sources EV-a19abb9b57ba268fc31864da
Detailed source fields
Original source fieldPublished value or condition
Entity ID15399
Entity NameAvangrid Power LLC
Plant ID70225
Plant NameShutler Energy Storage
Google MapMap
Bing MapMap
Plant StateOR
CountyGilliam
Balancing Authority CodeAVRN
SectorIPP Non-CHP
Generator IDSES
Nameplate Capacity (MW)41
Net Summer Capacity (MW)41
Net Winter Capacity (MW)41
TechnologyBatteries
Energy Source CodeMWH
Prime Mover CodeBA
Planned Operation Month3
Planned Operation Year2028
Status(U) Under construction, less than or equal to 50 percent complete
Latitude45.54
Longitude-120.18
Original text(U) Under construction, less than or equal to 50 percent complete
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idPlanned:1490

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Proposed:2678

Sources EV-e85730c28d87c9e0990fa94f
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 e52176475ec833e056d68e9d069156f4ddf606b5ca7a356c49cdb1ab5ff67356

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Planned:1490

Sources EV-a19abb9b57ba268fc31864da
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 50e4d3003d3b77c57234c9ed18a9e6cc1715c309200339391cdf149114b84128

Usage terms US government public domain

Source snapshots by date · USA · eia860

Shutler Energy Storage / SES

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Utility ID15399
Utility NameAvangrid Power LLC
Plant Code70225
Plant NameShutler Energy Storage
StateOR
CountyGilliam
Generator IDSES
TechnologyBatteries
Prime MoverBA
OwnershipS
Duct BurnersX
Can Bypass Heat Recovery Steam Generator?X
Nameplate Capacity (MW)41
Summer Capacity (MW)41
Winter Capacity (MW)41
StatusU
Effective Month3
Effective Year2028
Current Month3
Current Year2028
Associated with Combined Heat and Power SystemN
Sector NameIPP Non-CHP
Sector2
Previously CanceledN
Energy Source 1MWH
Original textU
source_record_id3_1_Generator_Y2025.xlsx#Proposed:2678

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Proposed:2678

Sources EV-e85730c28d87c9e0990fa94f
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 e52176475ec833e056d68e9d069156f4ddf606b5ca7a356c49cdb1ab5ff67356

Usage terms US government public domain

Source snapshots by date · USA · eia860m

Shutler Energy Storage / SES

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Entity ID15399
Entity NameAvangrid Power LLC
Plant ID70225
Plant NameShutler Energy Storage
Google MapMap
Bing MapMap
Plant StateOR
CountyGilliam
Balancing Authority CodeAVRN
SectorIPP Non-CHP
Generator IDSES
Nameplate Capacity (MW)41
Net Summer Capacity (MW)41
Net Winter Capacity (MW)41
TechnologyBatteries
Energy Source CodeMWH
Prime Mover CodeBA
Planned Operation Month3
Planned Operation Year2028
Status(U) Under construction, less than or equal to 50 percent complete
Latitude45.54
Longitude-120.18
Original text(U) Under construction, less than or equal to 50 percent complete
source_record_idPlanned:1490

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Planned:1490

Sources EV-a19abb9b57ba268fc31864da
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 50e4d3003d3b77c57234c9ed18a9e6cc1715c309200339391cdf149114b84128

Usage terms US government public domain

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel