Power assets and projects · USA · eia860m

Jasmine / JASMI

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)70 MWOriginal source column definition · Generator · (V) Under construction, more than 50 percent complete
As-of date 2026-08
Sources EV-eb1bf24ceaffd5fd54a97d52
Net Summer Capacity (MW)70 MWOriginal source column definition · Generator · (V) Under construction, more than 50 percent complete
As-of date 2026-08
Sources EV-eb1bf24ceaffd5fd54a97d52
Net Winter Capacity (MW)70 MWOriginal source column definition · Generator · (V) Under construction, more than 50 percent complete
As-of date 2026-08
Sources EV-eb1bf24ceaffd5fd54a97d52
Detailed source fields
Original source fieldPublished value or condition
Entity ID64904
Entity NameAES Clean Energy
Plant ID70109
Plant NameJasmine
Google MapMap
Bing MapMap
Plant StateCA
CountyKern
Balancing Authority CodeCISO
SectorIPP Non-CHP
Generator IDJASMI
Nameplate Capacity (MW)70
Net Summer Capacity (MW)70
Net Winter Capacity (MW)70
TechnologySolar Photovoltaic
Energy Source CodeSUN
Prime Mover CodePV
Planned Operation Month12
Planned Operation Year2027
Status(V) Under construction, more than 50 percent complete
Latitude35.1006
Longitude-119.1187
Original text(V) Under construction, more than 50 percent complete
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idPlanned:1392

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Proposed:2614

Sources EV-6d4bff2135ddf4c3b9e4bcff
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 22ed03dc0027f3827320f29cf0cb6d182c8a93b2a8a1f7529091efe484a72e59

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Planned:1392

Sources EV-eb1bf24ceaffd5fd54a97d52
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 fc9fe1b35388ed832f08d5161c0eb10117c4f60048a2183980ef4f188cf5f338

Usage terms US government public domain

Source snapshots by date · USA · eia860

Jasmine / JASMI

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Utility ID64904
Utility NameAES Clean Energy
Plant Code70109
Plant NameJasmine
StateCA
CountyKern
Generator IDJASMI
TechnologySolar Photovoltaic
Prime MoverPV
OwnershipS
Duct BurnersX
Can Bypass Heat Recovery Steam Generator?X
Nameplate Capacity (MW)70
Summer Capacity (MW)70
Winter Capacity (MW)70
StatusV
Effective Month12
Effective Year2026
Current Month5
Current Year2027
Associated with Combined Heat and Power SystemN
Sector NameIPP Non-CHP
Sector2
Previously CanceledN
Energy Source 1SUN
Original textV
source_record_id3_1_Generator_Y2025.xlsx#Proposed:2614

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Proposed:2614

Sources EV-6d4bff2135ddf4c3b9e4bcff
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 22ed03dc0027f3827320f29cf0cb6d182c8a93b2a8a1f7529091efe484a72e59

Usage terms US government public domain

Source snapshots by date · USA · eia860m

Jasmine / JASMI

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Entity ID64904
Entity NameAES Clean Energy
Plant ID70109
Plant NameJasmine
Google MapMap
Bing MapMap
Plant StateCA
CountyKern
Balancing Authority CodeCISO
SectorIPP Non-CHP
Generator IDJASMI
Nameplate Capacity (MW)70
Net Summer Capacity (MW)70
Net Winter Capacity (MW)70
TechnologySolar Photovoltaic
Energy Source CodeSUN
Prime Mover CodePV
Planned Operation Month12
Planned Operation Year2027
Status(V) Under construction, more than 50 percent complete
Latitude35.1006
Longitude-119.1187
Original text(V) Under construction, more than 50 percent complete
source_record_idPlanned:1392

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Planned:1392

Sources EV-eb1bf24ceaffd5fd54a97d52
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 fc9fe1b35388ed832f08d5161c0eb10117c4f60048a2183980ef4f188cf5f338

Usage terms US government public domain

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel