POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Power assets and projects · USA · eia860m

Beaver Gross Road Solar LLC / BEAVE

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)3 MWOriginal source column definition · Generator · (T) Regulatory approvals received. Not under construction
As-of date 2026-08
Sources EV-c3ca78374bfb832554b157fe
Net Summer Capacity (MW)3 MWOriginal source column definition · Generator · (T) Regulatory approvals received. Not under construction
As-of date 2026-08
Sources EV-c3ca78374bfb832554b157fe
Net Winter Capacity (MW)3 MWOriginal source column definition · Generator · (T) Regulatory approvals received. Not under construction
As-of date 2026-08
Sources EV-c3ca78374bfb832554b157fe
Detailed source fields
Original source fieldPublished value or condition
Entity ID65677
Entity NameDimension Energy LLC
Plant ID70024
Plant NameBeaver Gross Road Solar LLC
Google MapMap
Bing MapMap
Plant StatePA
CountySnyder
Balancing Authority CodePJM
SectorIPP Non-CHP
Generator IDBEAVE
Nameplate Capacity (MW)3
Net Summer Capacity (MW)3
Net Winter Capacity (MW)3
TechnologySolar Photovoltaic
Energy Source CodeSUN
Prime Mover CodePV
Planned Operation Month3
Planned Operation Year2028
Status(T) Regulatory approvals received. Not under construction
Latitude40.747397
Longitude-77.18922
Original text(T) Regulatory approvals received. Not under construction
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idPlanned:1487

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Proposed:2545

Sources EV-bd2748dc36d20103aa107e2e
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 c204d022c0f532797345abd5e6325d77de794e043766d17b23ddd4e4a26350c3

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Planned:1487

Sources EV-c3ca78374bfb832554b157fe
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 1fd6459a18643dfc4ca86d49c090e37d67e363a5764709069aa6aaf0540d24ed

Usage terms US government public domain

Source snapshots by date · USA · eia860m

Beaver Gross Road Solar LLC / BEAVE

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Entity ID65677
Entity NameDimension Energy LLC
Plant ID70024
Plant NameBeaver Gross Road Solar LLC
Google MapMap
Bing MapMap
Plant StatePA
CountySnyder
Balancing Authority CodePJM
SectorIPP Non-CHP
Generator IDBEAVE
Nameplate Capacity (MW)3
Net Summer Capacity (MW)3
Net Winter Capacity (MW)3
TechnologySolar Photovoltaic
Energy Source CodeSUN
Prime Mover CodePV
Planned Operation Month3
Planned Operation Year2028
Status(T) Regulatory approvals received. Not under construction
Latitude40.747397
Longitude-77.18922
Original text(T) Regulatory approvals received. Not under construction
source_record_idPlanned:1487

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Planned:1487

Sources EV-c3ca78374bfb832554b157fe
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 1fd6459a18643dfc4ca86d49c090e37d67e363a5764709069aa6aaf0540d24ed

Usage terms US government public domain

Source snapshots by date · USA · eia860

Beaver Gross Road Solar LLC / BEAVE

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Utility ID65677
Utility NameDimension Energy LLC
Plant Code70024
Plant NameBeaver Gross Road Solar LLC
StatePA
CountySnyder
Generator IDBEAVE
TechnologySolar Photovoltaic
Prime MoverPV
OwnershipS
Duct BurnersX
Can Bypass Heat Recovery Steam Generator?X
Nameplate Capacity (MW)3
Summer Capacity (MW)3
Winter Capacity (MW)3
StatusT
Effective Month3
Effective Year2028
Current Month3
Current Year2028
Associated with Combined Heat and Power SystemN
Sector NameIPP Non-CHP
Sector2
Previously CanceledN
Energy Source 1SUN
Original textT
source_record_id3_1_Generator_Y2025.xlsx#Proposed:2545

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Proposed:2545

Sources EV-bd2748dc36d20103aa107e2e
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 c204d022c0f532797345abd5e6325d77de794e043766d17b23ddd4e4a26350c3

Usage terms US government public domain

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel