Power assets and projects · USA · eia860m
Fast Ave Solar LLC / FASTA
Generator · Plan
Metric or condition
Source value
Basis, scope and stage
Nameplate Capacity (MW)
5 MW
Original source column definition · Generator · (U) Under construction, less than or equal to 50 percent complete As-of date 2026-08 Sources EV-f2a42cf1270b867a5ff20ccb
Net Summer Capacity (MW)
5 MW
Original source column definition · Generator · (U) Under construction, less than or equal to 50 percent complete As-of date 2026-08 Sources EV-f2a42cf1270b867a5ff20ccb
Net Winter Capacity (MW)
5 MW
Original source column definition · Generator · (U) Under construction, less than or equal to 50 percent complete As-of date 2026-08 Sources EV-f2a42cf1270b867a5ff20ccb
Detailed source fields
Original source field
Published value or condition
Entity ID
65677
Entity Name
Dimension Energy LLC
Plant ID
69997
Plant Name
Fast Ave Solar LLC
Google Map
Map
Bing Map
Map
Plant State
IL
County
Tazewell
Balancing Authority Code
MISO
Sector
IPP Non-CHP
Generator ID
FASTA
Nameplate Capacity (MW)
5
Net Summer Capacity (MW)
5
Net Winter Capacity (MW)
5
Technology
Solar Photovoltaic
Energy Source Code
SUN
Prime Mover Code
PV
Planned Operation Month
12
Planned Operation Year
2026
Status
(U) Under construction, less than or equal to 50 percent complete
Latitude
40.534803
Longitude
-89.28959
Original text
(U) Under construction, less than or equal to 50 percent complete