Warsaw 2 Energy Storage / WBA2

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)11 MWOriginal source column definition · Generator · (V) Under construction, more than 50 percent complete
As-of date 2026-08
Sources EV-0d172c37b40f9b4654f90c6a
Net Summer Capacity (MW)10.1 MWOriginal source column definition · Generator · (V) Under construction, more than 50 percent complete
As-of date 2026-08
Sources EV-0d172c37b40f9b4654f90c6a
Net Winter Capacity (MW)10.1 MWOriginal source column definition · Generator · (V) Under construction, more than 50 percent complete
As-of date 2026-08
Sources EV-0d172c37b40f9b4654f90c6a
Detailed source fields
Original source fieldPublished value or condition
Entity ID3046
Entity NameDuke Energy Progress - (NC)
Plant ID69988
Plant NameWarsaw 2 Energy Storage
Google MapMap
Bing MapMap
Plant StateNC
CountyDuplin
Balancing Authority CodeCPLE
SectorElectric Utility
Generator IDWBA2
Nameplate Capacity (MW)11
Net Summer Capacity (MW)10.1
Net Winter Capacity (MW)10.1
TechnologyBatteries
Energy Source CodeMWH
Prime Mover CodeBA
Planned Operation Month9
Planned Operation Year2026
Status(V) Under construction, more than 50 percent complete
Latitude35.003702
Longitude-78.1165
Original text(V) Under construction, more than 50 percent complete
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idPlanned:153

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Proposed:2510

Sources EV-971bb086427d22266658ca4c
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 d8c8400dfc8d645fac5ca6cd3d3cccc1689259ee374110801cfbf22efc594e59

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Planned:153

Sources EV-0d172c37b40f9b4654f90c6a
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 04b95f98adb6c941d049d864039a46caf917c1f6c9bed56d946c994fadbbb7a8

Usage terms US government public domain

Source snapshots by date · USA · eia860m

Warsaw 2 Energy Storage / WBA2

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Entity ID3046
Entity NameDuke Energy Progress - (NC)
Plant ID69988
Plant NameWarsaw 2 Energy Storage
Google MapMap
Bing MapMap
Plant StateNC
CountyDuplin
Balancing Authority CodeCPLE
SectorElectric Utility
Generator IDWBA2
Nameplate Capacity (MW)11
Net Summer Capacity (MW)10.1
Net Winter Capacity (MW)10.1
TechnologyBatteries
Energy Source CodeMWH
Prime Mover CodeBA
Planned Operation Month9
Planned Operation Year2026
Status(V) Under construction, more than 50 percent complete
Latitude35.003702
Longitude-78.1165
Original text(V) Under construction, more than 50 percent complete
source_record_idPlanned:153

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Planned:153

Sources EV-0d172c37b40f9b4654f90c6a
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 04b95f98adb6c941d049d864039a46caf917c1f6c9bed56d946c994fadbbb7a8

Usage terms US government public domain

Source snapshots by date · USA · eia860

Warsaw 2 Energy Storage / WBA2

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Utility ID3046
Utility NameDuke Energy Progress - (NC)
Plant Code69988
Plant NameWarsaw 2 Energy Storage
StateNC
CountyDuplin
Generator IDWBA2
TechnologyBatteries
Prime MoverBA
OwnershipS
Duct BurnersX
Can Bypass Heat Recovery Steam Generator?X
Nameplate Capacity (MW)11
Summer Capacity (MW)10.1
Winter Capacity (MW)10.1
StatusU
Effective Month6
Effective Year2026
Current Month8
Current Year2026
Associated with Combined Heat and Power SystemN
Sector NameElectric Utility
Sector1
Previously CanceledN
Energy Source 1MWH
Original textU
source_record_id3_1_Generator_Y2025.xlsx#Proposed:2510

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Proposed:2510

Sources EV-971bb086427d22266658ca4c
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 d8c8400dfc8d645fac5ca6cd3d3cccc1689259ee374110801cfbf22efc594e59

Usage terms US government public domain

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel