Power assets and projects · USA · eia860m
7999 Gateway Solar / 7999G
Generator · Plan
Metric or condition
Source value
Basis, scope and stage
Nameplate Capacity (MW)
4.6 MW
Original source column definition · Generator · (U) Under construction, less than or equal to 50 percent complete As-of date 2026-08 Sources EV-a500336f29537493aa04b22e
Net Summer Capacity (MW)
4.6 MW
Original source column definition · Generator · (U) Under construction, less than or equal to 50 percent complete As-of date 2026-08 Sources EV-a500336f29537493aa04b22e
Net Winter Capacity (MW)
4.6 MW
Original source column definition · Generator · (U) Under construction, less than or equal to 50 percent complete As-of date 2026-08 Sources EV-a500336f29537493aa04b22e
Detailed source fields
Original source field
Published value or condition
Entity ID
67754
Entity Name
Coast Energy Holdings, LLC
Plant ID
69896
Plant Name
7999 Gateway Solar
Google Map
Map
Bing Map
Map
Plant State
CA
County
Alameda
Balancing Authority Code
CISO
Sector
IPP Non-CHP
Generator ID
7999G
Nameplate Capacity (MW)
4.6
Net Summer Capacity (MW)
4.6
Net Winter Capacity (MW)
4.6
Technology
Solar Photovoltaic
Energy Source Code
SUN
Prime Mover Code
PV
Planned Operation Month
9
Planned Operation Year
2026
Status
(U) Under construction, less than or equal to 50 percent complete
Latitude
37.5215
Longitude
-122.0397
Original text
(U) Under construction, less than or equal to 50 percent complete