POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Power assets and projects · USA · eia860m

Windsor BESS / BAT1

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)3.9 MWOriginal source column definition · Generator · (V) Under construction, more than 50 percent complete
As-of date 2026-08
Sources EV-cd9680fa5c4bea7c48171ea7
Net Summer Capacity (MW)3.9 MWOriginal source column definition · Generator · (V) Under construction, more than 50 percent complete
As-of date 2026-08
Sources EV-cd9680fa5c4bea7c48171ea7
Net Winter Capacity (MW)3.9 MWOriginal source column definition · Generator · (V) Under construction, more than 50 percent complete
As-of date 2026-08
Sources EV-cd9680fa5c4bea7c48171ea7
Detailed source fields
Original source fieldPublished value or condition
Entity ID13683
Entity NameNorth Carolina El Member Corp
Plant ID69872
Plant NameWindsor BESS
Google MapMap
Bing MapMap
Plant StateNC
CountyBertie
Balancing Authority CodePJM
SectorElectric Utility
Generator IDBAT1
Nameplate Capacity (MW)3.9
Net Summer Capacity (MW)3.9
Net Winter Capacity (MW)3.9
TechnologyBatteries
Energy Source CodeMWH
Prime Mover CodeBA
Planned Operation Month12
Planned Operation Year2026
Status(V) Under construction, more than 50 percent complete
Latitude36.025838
Longitude-76.98179
Original text(V) Under construction, more than 50 percent complete
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idPlanned:563

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Proposed:2425

Sources EV-2524206d12f61adf9614abb9
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 8c20f2da0edb3e6c2be8e427dfa95c37c750cdbce61464b11f4f7587bb220b50

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Planned:563

Sources EV-cd9680fa5c4bea7c48171ea7
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 05e0d5dcfacf2b5f3b3273c7c445201a93509a0e563b45cb642d1b068c9a74c1

Usage terms US government public domain

Source snapshots by date · USA · eia860m

Windsor BESS / BAT1

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Entity ID13683
Entity NameNorth Carolina El Member Corp
Plant ID69872
Plant NameWindsor BESS
Google MapMap
Bing MapMap
Plant StateNC
CountyBertie
Balancing Authority CodePJM
SectorElectric Utility
Generator IDBAT1
Nameplate Capacity (MW)3.9
Net Summer Capacity (MW)3.9
Net Winter Capacity (MW)3.9
TechnologyBatteries
Energy Source CodeMWH
Prime Mover CodeBA
Planned Operation Month12
Planned Operation Year2026
Status(V) Under construction, more than 50 percent complete
Latitude36.025838
Longitude-76.98179
Original text(V) Under construction, more than 50 percent complete
source_record_idPlanned:563

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Planned:563

Sources EV-cd9680fa5c4bea7c48171ea7
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 05e0d5dcfacf2b5f3b3273c7c445201a93509a0e563b45cb642d1b068c9a74c1

Usage terms US government public domain

Source snapshots by date · USA · eia860

Windsor BESS / BAT1

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Utility ID13683
Utility NameNorth Carolina El Member Corp
Plant Code69872
Plant NameWindsor BESS
StateNC
CountyBertie
Generator IDBAT1
TechnologyBatteries
Prime MoverBA
OwnershipS
Duct BurnersX
Can Bypass Heat Recovery Steam Generator?X
Nameplate Capacity (MW)3.7
Summer Capacity (MW)3.7
Winter Capacity (MW)3.7
StatusP
Effective Month12
Effective Year2026
Current Month12
Current Year2026
Sector NameElectric Utility
Sector1
Previously CanceledN
Energy Source 1MWH
Original textP
source_record_id3_1_Generator_Y2025.xlsx#Proposed:2425

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Proposed:2425

Sources EV-2524206d12f61adf9614abb9
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 8c20f2da0edb3e6c2be8e427dfa95c37c750cdbce61464b11f4f7587bb220b50

Usage terms US government public domain

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel