Review power assets, contract observations, facility specifications and relationships from public sources.
This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 3items · current page 1–3 · Source records, not unique facilities.
Power assets and projects · USA · eia860m
Murphysboro 2 / MURP2
Generator · Plan
Metric or condition
Source value
Basis, scope and stage
Nameplate Capacity (MW)
1.3 MW
Original source column definition · Generator · (T) Regulatory approvals received. Not under construction As-of date 2026-08 Sources EV-05c869a07c9f50e46660c4fb
Net Summer Capacity (MW)
1.3 MW
Original source column definition · Generator · (T) Regulatory approvals received. Not under construction As-of date 2026-08 Sources EV-05c869a07c9f50e46660c4fb
Net Winter Capacity (MW)
1.3 MW
Original source column definition · Generator · (T) Regulatory approvals received. Not under construction As-of date 2026-08 Sources EV-05c869a07c9f50e46660c4fb
Detailed source fields
Original source field
Published value or condition
Entity ID
62836
Entity Name
Navisun LLC
Plant ID
69860
Plant Name
Murphysboro 2
Google Map
Map
Bing Map
Map
Plant State
IL
County
Jackson
Balancing Authority Code
PJM
Sector
IPP Non-CHP
Generator ID
MURP2
Nameplate Capacity (MW)
1.3
Net Summer Capacity (MW)
1.3
Net Winter Capacity (MW)
1.3
Technology
Solar Photovoltaic
Energy Source Code
SUN
Prime Mover Code
PV
Planned Operation Month
10
Planned Operation Year
2027
Status
(T) Regulatory approvals received. Not under construction
Latitude
37.794585
Longitude
-89.35141
Original text
(T) Regulatory approvals received. Not under construction