POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Power assets and projects · USA · eia860m

Keamuku / KEAMU

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)86 MWOriginal source column definition · Generator · (L) Regulatory approvals pending. Not under construction
As-of date 2026-08
Sources EV-d29c65d55752166ec5c7f082
Net Summer Capacity (MW)86 MWOriginal source column definition · Generator · (L) Regulatory approvals pending. Not under construction
As-of date 2026-08
Sources EV-d29c65d55752166ec5c7f082
Net Winter Capacity (MW)86 MWOriginal source column definition · Generator · (L) Regulatory approvals pending. Not under construction
As-of date 2026-08
Sources EV-d29c65d55752166ec5c7f082
Detailed source fields
Original source fieldPublished value or condition
Entity ID64904
Entity NameAES Clean Energy
Plant ID69795
Plant NameKeamuku
Google MapMap
Bing MapMap
Plant StateHI
CountyHawaii
Balancing Authority CodeHECO
SectorIPP Non-CHP
Generator IDKEAMU
Nameplate Capacity (MW)86
Net Summer Capacity (MW)86
Net Winter Capacity (MW)86
TechnologySolar Photovoltaic
Energy Source CodeSUN
Prime Mover CodePV
Planned Operation Month5
Planned Operation Year2030
Status(L) Regulatory approvals pending. Not under construction
Latitude19.8799
Longitude-155.7373
Original text(L) Regulatory approvals pending. Not under construction
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idPlanned:2063

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Proposed:2181

Sources EV-97fd57f0b789900487fa00d0
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 3f58a611b2dd53102433a177b306495b1edad8f3dd67d18827ecd8b88045e0da

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Planned:2063

Sources EV-d29c65d55752166ec5c7f082
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 72bee04a4b8bbe0e6f24b4e22542713e0fac2d44b5fc2ef61ab3955bd636e9c2

Usage terms US government public domain

Source snapshots by date · USA · eia860

Keamuku / KEAMU

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Utility ID64904
Utility NameAES Clean Energy
Plant Code69795
Plant NameKeamuku
StateHI
CountyHawaii
Generator IDKEAMU
TechnologySolar Photovoltaic
Prime MoverPV
OwnershipS
Duct BurnersX
Can Bypass Heat Recovery Steam Generator?X
Nameplate Capacity (MW)86
Summer Capacity (MW)86
Winter Capacity (MW)86
StatusL
Effective Month12
Effective Year2030
Current Month5
Current Year2030
Sector NameIPP Non-CHP
Sector2
Previously CanceledN
Energy Source 1SUN
Original textL
source_record_id3_1_Generator_Y2025.xlsx#Proposed:2181

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Proposed:2181

Sources EV-97fd57f0b789900487fa00d0
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 3f58a611b2dd53102433a177b306495b1edad8f3dd67d18827ecd8b88045e0da

Usage terms US government public domain

Source snapshots by date · USA · eia860m

Keamuku / KEAMU

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Entity ID64904
Entity NameAES Clean Energy
Plant ID69795
Plant NameKeamuku
Google MapMap
Bing MapMap
Plant StateHI
CountyHawaii
Balancing Authority CodeHECO
SectorIPP Non-CHP
Generator IDKEAMU
Nameplate Capacity (MW)86
Net Summer Capacity (MW)86
Net Winter Capacity (MW)86
TechnologySolar Photovoltaic
Energy Source CodeSUN
Prime Mover CodePV
Planned Operation Month5
Planned Operation Year2030
Status(L) Regulatory approvals pending. Not under construction
Latitude19.8799
Longitude-155.7373
Original text(L) Regulatory approvals pending. Not under construction
source_record_idPlanned:2063

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Planned:2063

Sources EV-d29c65d55752166ec5c7f082
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 72bee04a4b8bbe0e6f24b4e22542713e0fac2d44b5fc2ef61ab3955bd636e9c2

Usage terms US government public domain

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel