POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Power assets and projects · USA · eia860m

Elizabeth Metropolitan Logistics Center / EZMLC

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)1.2 MWOriginal source column definition · Generator · (TS) Construction complete, but not yet in commercial operation
As-of date 2026-08
Sources EV-da5b36e10bca2511f5581ea1
Net Summer Capacity (MW)1.2 MWOriginal source column definition · Generator · (TS) Construction complete, but not yet in commercial operation
As-of date 2026-08
Sources EV-da5b36e10bca2511f5581ea1
Net Winter Capacity (MW)1.2 MWOriginal source column definition · Generator · (TS) Construction complete, but not yet in commercial operation
As-of date 2026-08
Sources EV-da5b36e10bca2511f5581ea1
Detailed source fields
Original source fieldPublished value or condition
Entity ID60531
Entity NameStandard Solar
Plant ID69790
Plant NameElizabeth Metropolitan Logistics Center
Google MapMap
Bing MapMap
Plant StateNJ
CountyUnion
Balancing Authority CodePJM
SectorIPP Non-CHP
Generator IDEZMLC
Nameplate Capacity (MW)1.2
Net Summer Capacity (MW)1.2
Net Winter Capacity (MW)1.2
TechnologySolar Photovoltaic
Energy Source CodeSUN
Prime Mover CodePV
Planned Operation Month9
Planned Operation Year2026
Status(TS) Construction complete, but not yet in commercial operation
Latitude40.68403
Longitude-74.20623
Original text(TS) Construction complete, but not yet in commercial operation
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idPlanned:140

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Proposed:2175

Sources EV-1f256b23223a591a1c841166
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 a3f7ec6b98ff960b80af0b53360deb504b6f98a37872fe96744a849b3da502dc

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Planned:140

Sources EV-da5b36e10bca2511f5581ea1
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 2ec4c471da5c1e9df8fae99a8787d2da89c71d477f776249e2cbe2f251549c78

Usage terms US government public domain

Source snapshots by date · USA · eia860m

Elizabeth Metropolitan Logistics Center / EZMLC

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Entity ID60531
Entity NameStandard Solar
Plant ID69790
Plant NameElizabeth Metropolitan Logistics Center
Google MapMap
Bing MapMap
Plant StateNJ
CountyUnion
Balancing Authority CodePJM
SectorIPP Non-CHP
Generator IDEZMLC
Nameplate Capacity (MW)1.2
Net Summer Capacity (MW)1.2
Net Winter Capacity (MW)1.2
TechnologySolar Photovoltaic
Energy Source CodeSUN
Prime Mover CodePV
Planned Operation Month9
Planned Operation Year2026
Status(TS) Construction complete, but not yet in commercial operation
Latitude40.68403
Longitude-74.20623
Original text(TS) Construction complete, but not yet in commercial operation
source_record_idPlanned:140

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Planned:140

Sources EV-da5b36e10bca2511f5581ea1
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 2ec4c471da5c1e9df8fae99a8787d2da89c71d477f776249e2cbe2f251549c78

Usage terms US government public domain

Source snapshots by date · USA · eia860

Elizabeth Metropolitan Logistics Center / EZMLC

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Utility ID60531
Utility NameStandard Solar
Plant Code69790
Plant NameElizabeth Metropolitan Logistics Center
StateNJ
CountyUnion
Generator IDEZMLC
TechnologySolar Photovoltaic
Prime MoverPV
OwnershipS
Duct BurnersX
Can Bypass Heat Recovery Steam Generator?X
Nameplate Capacity (MW)1.2
Summer Capacity (MW)1.2
Winter Capacity (MW)1.2
StatusTS
Effective Month4
Effective Year2025
Current Month9
Current Year2026
Associated with Combined Heat and Power SystemN
Sector NameIPP Non-CHP
Sector2
Previously CanceledN
Energy Source 1SUN
Original textTS
source_record_id3_1_Generator_Y2025.xlsx#Proposed:2175

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Proposed:2175

Sources EV-1f256b23223a591a1c841166
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 a3f7ec6b98ff960b80af0b53360deb504b6f98a37872fe96744a849b3da502dc

Usage terms US government public domain

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel