POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Power assets and projects · USA · eia860m

Rock Island Generation Project / RIG3

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)20.3 MWOriginal source column definition · Generator · (L) Regulatory approvals pending. Not under construction
As-of date 2026-08
Sources EV-cbd815fb8d3250c14a8beec4
Net Summer Capacity (MW)19.9 MWOriginal source column definition · Generator · (L) Regulatory approvals pending. Not under construction
As-of date 2026-08
Sources EV-cbd815fb8d3250c14a8beec4
Net Winter Capacity (MW)19.9 MWOriginal source column definition · Generator · (L) Regulatory approvals pending. Not under construction
As-of date 2026-08
Sources EV-cbd815fb8d3250c14a8beec4
Detailed source fields
Original source fieldPublished value or condition
Entity ID67625
Entity NameKerrville Public Utility Board Public Facility Corp
Plant ID69760
Plant NameRock Island Generation Project
Google MapMap
Bing MapMap
Plant StateTX
CountyColorado
Balancing Authority CodeERCO
SectorElectric Utility
Generator IDRIG3
Nameplate Capacity (MW)20.3
Net Summer Capacity (MW)19.9
Net Winter Capacity (MW)19.9
TechnologyNatural Gas Internal Combustion Engine
Energy Source CodeNG
Prime Mover CodeIC
Planned Operation Month9
Planned Operation Year2027
Status(L) Regulatory approvals pending. Not under construction
Latitude29.55068
Longitude-96.53675
Original text(L) Regulatory approvals pending. Not under construction
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idPlanned:1034

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Proposed:2138

Sources EV-a5d3d9d99e0cbd1389f7f1c9
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 ef5c43855fb821df285608e0b24b933a908bc117e3529c9d726488ca125d5994

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Planned:1034

Sources EV-cbd815fb8d3250c14a8beec4
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 dad4a4ea620d502dc8f484ca6835f9eb21b18ea34a3df5a12d5e8f8fb4238afb

Usage terms US government public domain

Source snapshots by date · USA · eia860m

Rock Island Generation Project / RIG3

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Entity ID67625
Entity NameKerrville Public Utility Board Public Facility Corp
Plant ID69760
Plant NameRock Island Generation Project
Google MapMap
Bing MapMap
Plant StateTX
CountyColorado
Balancing Authority CodeERCO
SectorElectric Utility
Generator IDRIG3
Nameplate Capacity (MW)20.3
Net Summer Capacity (MW)19.9
Net Winter Capacity (MW)19.9
TechnologyNatural Gas Internal Combustion Engine
Energy Source CodeNG
Prime Mover CodeIC
Planned Operation Month9
Planned Operation Year2027
Status(L) Regulatory approvals pending. Not under construction
Latitude29.55068
Longitude-96.53675
Original text(L) Regulatory approvals pending. Not under construction
source_record_idPlanned:1034

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Planned:1034

Sources EV-cbd815fb8d3250c14a8beec4
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 dad4a4ea620d502dc8f484ca6835f9eb21b18ea34a3df5a12d5e8f8fb4238afb

Usage terms US government public domain

Source snapshots by date · USA · eia860

Rock Island Generation Project / RIG3

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Utility ID67625
Utility NameKerrville Public Utility Board Public Facility Corp
Plant Code69760
Plant NameRock Island Generation Project
StateTX
CountyColorado
Generator IDRIG3
TechnologyNatural Gas Internal Combustion Engine
Prime MoverIC
OwnershipS
Duct BurnersX
Can Bypass Heat Recovery Steam Generator?X
RTO/ISO LMP Node DesignationSKY1
RTO/ISO Location Designation for Reporting Wholesale Sales Data to FERCROCK ISLAND GENERATING
Nameplate Capacity (MW)20.3
Nameplate Power Factor0.8
Summer Capacity (MW)19.9
Winter Capacity (MW)19.9
StatusL
Effective Month8
Effective Year2027
Current Month9
Current Year2027
Sector NameElectric Utility
Sector1
Previously CanceledN
Energy Source 1NG
Multiple Fuels?N
Original textL
source_record_id3_1_Generator_Y2025.xlsx#Proposed:2138

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Proposed:2138

Sources EV-a5d3d9d99e0cbd1389f7f1c9
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 ef5c43855fb821df285608e0b24b933a908bc117e3529c9d726488ca125d5994

Usage terms US government public domain

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel