POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Power assets and projects · USA · eia860m

Liberty Station / L1

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)18.1 MWOriginal source column definition · Generator · (P) Planned for installation, but regulatory approvals not initiated
As-of date 2026-08
Sources EV-0ef855722ba3219ea47c8bc2
Net Summer Capacity (MW)17.8 MWOriginal source column definition · Generator · (P) Planned for installation, but regulatory approvals not initiated
As-of date 2026-08
Sources EV-0ef855722ba3219ea47c8bc2
Net Winter Capacity (MW)17.8 MWOriginal source column definition · Generator · (P) Planned for installation, but regulatory approvals not initiated
As-of date 2026-08
Sources EV-0ef855722ba3219ea47c8bc2
Detailed source fields
Original source fieldPublished value or condition
Entity ID5580
Entity NameEast Kentucky Power Coop, Inc
Plant ID69726
Plant NameLiberty Station
Google MapMap
Bing MapMap
Plant StateKY
CountyCasey
Balancing Authority CodePJM
SectorElectric Utility
Generator IDL1
Nameplate Capacity (MW)18.1
Net Summer Capacity (MW)17.8
Net Winter Capacity (MW)17.8
TechnologyNatural Gas Internal Combustion Engine
Energy Source CodeNG
Prime Mover CodeIC
Planned Operation Month12
Planned Operation Year2028
Status(P) Planned for installation, but regulatory approvals not initiated
Latitude37.369331
Longitude-84.95767
Original text(P) Planned for installation, but regulatory approvals not initiated
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idPlanned:1815

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Proposed:2111

Sources EV-7b015a36f9d1036dd7150d6a
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 2518358cf37d13bd56ca713220ed2a2890198970627e59a25f1e56b0b841d431

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Planned:1815

Sources EV-0ef855722ba3219ea47c8bc2
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 da157cc09d84fedba73d1318b301ac2d2ef7652e2a08b5724e54bdcf25eb01f7

Usage terms US government public domain

Source snapshots by date · USA · eia860m

Liberty Station / L1

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Entity ID5580
Entity NameEast Kentucky Power Coop, Inc
Plant ID69726
Plant NameLiberty Station
Google MapMap
Bing MapMap
Plant StateKY
CountyCasey
Balancing Authority CodePJM
SectorElectric Utility
Generator IDL1
Nameplate Capacity (MW)18.1
Net Summer Capacity (MW)17.8
Net Winter Capacity (MW)17.8
TechnologyNatural Gas Internal Combustion Engine
Energy Source CodeNG
Prime Mover CodeIC
Planned Operation Month12
Planned Operation Year2028
Status(P) Planned for installation, but regulatory approvals not initiated
Latitude37.369331
Longitude-84.95767
Original text(P) Planned for installation, but regulatory approvals not initiated
source_record_idPlanned:1815

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Planned:1815

Sources EV-0ef855722ba3219ea47c8bc2
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 da157cc09d84fedba73d1318b301ac2d2ef7652e2a08b5724e54bdcf25eb01f7

Usage terms US government public domain

Source snapshots by date · USA · eia860

Liberty Station / L1

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Utility ID5580
Utility NameEast Kentucky Power Coop, Inc
Plant Code69726
Plant NameLiberty Station
StateKY
CountyCasey
Generator IDL1
TechnologyNatural Gas Internal Combustion Engine
Prime MoverIC
OwnershipS
Duct BurnersX
Can Bypass Heat Recovery Steam Generator?X
Nameplate Capacity (MW)18.1
Nameplate Power Factor0.8
Summer Capacity (MW)17.8
Winter Capacity (MW)17.8
StatusP
Effective Month12
Effective Year2028
Current Month12
Current Year2028
Sector NameElectric Utility
Sector1
Previously CanceledN
Energy Source 1NG
Energy Source 2DFO
Multiple Fuels?Y
Switch Between Oil and Natural Gas?Y
Cofire Fuels?N
Original textP
source_record_id3_1_Generator_Y2025.xlsx#Proposed:2111

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Proposed:2111

Sources EV-7b015a36f9d1036dd7150d6a
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 2518358cf37d13bd56ca713220ed2a2890198970627e59a25f1e56b0b841d431

Usage terms US government public domain

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel