This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Power assets and projects · USA · eia860m

Superior Solar Project, LLC / SPROR

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)150 MWOriginal source column definition · Generator · (P) Planned for installation, but regulatory approvals not initiated
As-of date 2026-08
Sources EV-a207084d884e29b7e8e22f3e
Net Summer Capacity (MW)100 MWOriginal source column definition · Generator · (P) Planned for installation, but regulatory approvals not initiated
As-of date 2026-08
Sources EV-a207084d884e29b7e8e22f3e
Net Winter Capacity (MW)100 MWOriginal source column definition · Generator · (P) Planned for installation, but regulatory approvals not initiated
As-of date 2026-08
Sources EV-a207084d884e29b7e8e22f3e
Detailed source fields
Original source fieldPublished value or condition
Entity ID49893
Entity NameInvenergy Services LLC
Plant ID69577
Plant NameSuperior Solar Project, LLC
Google MapMap
Bing MapMap
Plant StateMI
CountyMarquette
Balancing Authority CodeMISO
SectorIPP Non-CHP
Generator IDSPROR
Nameplate Capacity (MW)150
Net Summer Capacity (MW)100
Net Winter Capacity (MW)100
TechnologySolar Photovoltaic
Energy Source CodeSUN
Prime Mover CodePV
Planned Operation Month12
Planned Operation Year2028
Status(P) Planned for installation, but regulatory approvals not initiated
Latitude46.455
Longitude-87.466
Original text(P) Planned for installation, but regulatory approvals not initiated
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idPlanned:1809

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Proposed:1952

Sources EV-28ceca3fbbfee4a002f17d76
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 518df04f80869c6231c3d50e6dba284de6d3af66e61e3148b1bd9f582eb64da4

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Planned:1809

Sources EV-a207084d884e29b7e8e22f3e
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 b3cd49f7a234e784cc3bf37884856da6ed3d4b00a28f8b78899cab9458285bbc

Usage terms US government public domain

Source snapshots by date · USA · eia860m

Superior Solar Project, LLC / SPROR

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Entity ID49893
Entity NameInvenergy Services LLC
Plant ID69577
Plant NameSuperior Solar Project, LLC
Google MapMap
Bing MapMap
Plant StateMI
CountyMarquette
Balancing Authority CodeMISO
SectorIPP Non-CHP
Generator IDSPROR
Nameplate Capacity (MW)150
Net Summer Capacity (MW)100
Net Winter Capacity (MW)100
TechnologySolar Photovoltaic
Energy Source CodeSUN
Prime Mover CodePV
Planned Operation Month12
Planned Operation Year2028
Status(P) Planned for installation, but regulatory approvals not initiated
Latitude46.455
Longitude-87.466
Original text(P) Planned for installation, but regulatory approvals not initiated
source_record_idPlanned:1809

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Planned:1809

Sources EV-a207084d884e29b7e8e22f3e
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 b3cd49f7a234e784cc3bf37884856da6ed3d4b00a28f8b78899cab9458285bbc

Usage terms US government public domain

Source snapshots by date · USA · eia860

Superior Solar Project, LLC / SPROR

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Utility ID49893
Utility NameInvenergy Services LLC
Plant Code69577
Plant NameSuperior Solar Project, LLC
StateMI
CountyMarquette
Generator IDSPROR
TechnologySolar Photovoltaic
Prime MoverPV
OwnershipS
Duct BurnersX
Can Bypass Heat Recovery Steam Generator?X
RTO/ISO LMP Node DesignationMIUP.WEPM
Nameplate Capacity (MW)150
Summer Capacity (MW)100
Winter Capacity (MW)100
StatusP
Effective Month12
Effective Year2028
Current Month12
Current Year2028
Associated with Combined Heat and Power SystemN
Sector NameIPP Non-CHP
Sector2
Previously CanceledN
Energy Source 1SUN
Original textP
source_record_id3_1_Generator_Y2025.xlsx#Proposed:1952

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Proposed:1952

Sources EV-28ceca3fbbfee4a002f17d76
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 518df04f80869c6231c3d50e6dba284de6d3af66e61e3148b1bd9f582eb64da4

Usage terms US government public domain

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel