Power assets and projects · USA · eia860m

Mattaniah Solar / 1

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)52 MWOriginal source column definition · Generator · (U) Under construction, less than or equal to 50 percent complete
As-of date 2026-08
Sources EV-6fc9b3aaa11609335fea4378
Net Summer Capacity (MW)52 MWOriginal source column definition · Generator · (U) Under construction, less than or equal to 50 percent complete
As-of date 2026-08
Sources EV-6fc9b3aaa11609335fea4378
Net Winter Capacity (MW)52 MWOriginal source column definition · Generator · (U) Under construction, less than or equal to 50 percent complete
As-of date 2026-08
Sources EV-6fc9b3aaa11609335fea4378
Detailed source fields
Original source fieldPublished value or condition
Entity ID18454
Entity NameTampa Electric Co
Plant ID69523
Plant NameMattaniah Solar
Google MapMap
Bing MapMap
Plant StateFL
CountyPolk
Balancing Authority CodeTEC
SectorElectric Utility
Generator ID1
Nameplate Capacity (MW)52
Net Summer Capacity (MW)52
Net Winter Capacity (MW)52
TechnologySolar Photovoltaic
Energy Source CodeSUN
Prime Mover CodePV
Planned Operation Month12
Planned Operation Year2026
Status(U) Under construction, less than or equal to 50 percent complete
Latitude27.893214
Longitude-82.04614
Original text(U) Under construction, less than or equal to 50 percent complete
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idPlanned:542

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Proposed:1922

Sources EV-4930d1ff9e5e4dbe046bc1c9
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 983f233dff0b728ec9572a50475b257cd0ff5db87459c93d7ca489ae43ee24d5

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Planned:542

Sources EV-6fc9b3aaa11609335fea4378
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 409b206ac2754852b2ce766e83c32d1e74ddf0ea21613bfc6e294b6ad6ff710e

Usage terms US government public domain

Source snapshots by date · USA · eia860

Mattaniah Solar / 1

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Utility ID18454
Utility NameTampa Electric Co
Plant Code69523
Plant NameMattaniah Solar
StateFL
CountyPolk
Generator ID1
TechnologySolar Photovoltaic
Prime MoverPV
OwnershipS
Duct BurnersX
Can Bypass Heat Recovery Steam Generator?X
Nameplate Capacity (MW)52
Summer Capacity (MW)52
Winter Capacity (MW)52
StatusU
Effective Month12
Effective Year2026
Current Month12
Current Year2026
Associated with Combined Heat and Power SystemN
Sector NameElectric Utility
Sector1
Previously CanceledN
Energy Source 1SUN
Original textU
source_record_id3_1_Generator_Y2025.xlsx#Proposed:1922

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Proposed:1922

Sources EV-4930d1ff9e5e4dbe046bc1c9
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 983f233dff0b728ec9572a50475b257cd0ff5db87459c93d7ca489ae43ee24d5

Usage terms US government public domain

Source snapshots by date · USA · eia860m

Mattaniah Solar / 1

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Entity ID18454
Entity NameTampa Electric Co
Plant ID69523
Plant NameMattaniah Solar
Google MapMap
Bing MapMap
Plant StateFL
CountyPolk
Balancing Authority CodeTEC
SectorElectric Utility
Generator ID1
Nameplate Capacity (MW)52
Net Summer Capacity (MW)52
Net Winter Capacity (MW)52
TechnologySolar Photovoltaic
Energy Source CodeSUN
Prime Mover CodePV
Planned Operation Month12
Planned Operation Year2026
Status(U) Under construction, less than or equal to 50 percent complete
Latitude27.893214
Longitude-82.04614
Original text(U) Under construction, less than or equal to 50 percent complete
source_record_idPlanned:542

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Planned:542

Sources EV-6fc9b3aaa11609335fea4378
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 409b206ac2754852b2ce766e83c32d1e74ddf0ea21613bfc6e294b6ad6ff710e

Usage terms US government public domain

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel