Review power assets, contract observations, facility specifications and relationships from public sources.
This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 3items · current page 1–3 · Source records, not unique facilities.
Power assets and projects · USA · eia860m
Silver Creek Solar Park / SVCSP
Generator · Plan
Metric or condition
Source value
Basis, scope and stage
Nameplate Capacity (MW)
200 MW
Original source column definition · Generator · (U) Under construction, less than or equal to 50 percent complete As-of date 2026-08 Sources EV-b01d19868408b865db23bb58
Net Summer Capacity (MW)
200 MW
Original source column definition · Generator · (U) Under construction, less than or equal to 50 percent complete As-of date 2026-08 Sources EV-b01d19868408b865db23bb58
Net Winter Capacity (MW)
200 MW
Original source column definition · Generator · (U) Under construction, less than or equal to 50 percent complete As-of date 2026-08 Sources EV-b01d19868408b865db23bb58
Detailed source fields
Original source field
Published value or condition
Entity ID
5109
Entity Name
DTE Electric Company
Plant ID
69470
Plant Name
Silver Creek Solar Park
Google Map
Map
Bing Map
Map
Plant State
MI
County
Huron
Balancing Authority Code
MISO
Sector
Electric Utility
Generator ID
SVCSP
Nameplate Capacity (MW)
200
Net Summer Capacity (MW)
200
Net Winter Capacity (MW)
200
Technology
Solar Photovoltaic
Energy Source Code
SUN
Prime Mover Code
PV
Planned Operation Month
8
Planned Operation Year
2028
Status
(U) Under construction, less than or equal to 50 percent complete
Latitude
43.837206
Longitude
-83.05481
Original text
(U) Under construction, less than or equal to 50 percent complete