Review power assets, contract observations, facility specifications and relationships from public sources.
This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 3items · current page 1–3 · Source records, not unique facilities.
Power assets and projects · USA · eia860m
Poseyville Solar Park / PSVSP
Generator · Plan
Metric or condition
Source value
Basis, scope and stage
Nameplate Capacity (MW)
206.4 MW
Original source column definition · Generator · (U) Under construction, less than or equal to 50 percent complete As-of date 2026-08 Sources EV-abdd05a87cbef2490a4e2f1d
Net Summer Capacity (MW)
117 MW
Original source column definition · Generator · (U) Under construction, less than or equal to 50 percent complete As-of date 2026-08 Sources EV-abdd05a87cbef2490a4e2f1d
Net Winter Capacity (MW)
117 MW
Original source column definition · Generator · (U) Under construction, less than or equal to 50 percent complete As-of date 2026-08 Sources EV-abdd05a87cbef2490a4e2f1d
Detailed source fields
Original source field
Published value or condition
Entity ID
5109
Entity Name
DTE Electric Company
Plant ID
69468
Plant Name
Poseyville Solar Park
Google Map
Map
Bing Map
Map
Plant State
MI
County
Midland
Balancing Authority Code
MISO
Sector
Electric Utility
Generator ID
PSVSP
Nameplate Capacity (MW)
206.4
Net Summer Capacity (MW)
117
Net Winter Capacity (MW)
117
Technology
Solar Photovoltaic
Energy Source Code
SUN
Prime Mover Code
PV
Planned Operation Month
4
Planned Operation Year
2028
Status
(U) Under construction, less than or equal to 50 percent complete
Latitude
43.5178
Longitude
-84.2254
Original text
(U) Under construction, less than or equal to 50 percent complete