POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Power assets and projects · USA · eia860m

Cedar Field Solar Park / CDFSP

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)145 MWOriginal source column definition · Generator · (V) Under construction, more than 50 percent complete
As-of date 2026-08
Sources EV-154d973f080ae6adfe54d769
Net Summer Capacity (MW)145 MWOriginal source column definition · Generator · (V) Under construction, more than 50 percent complete
As-of date 2026-08
Sources EV-154d973f080ae6adfe54d769
Net Winter Capacity (MW)145 MWOriginal source column definition · Generator · (V) Under construction, more than 50 percent complete
As-of date 2026-08
Sources EV-154d973f080ae6adfe54d769
Detailed source fields
Original source fieldPublished value or condition
Entity ID5109
Entity NameDTE Electric Company
Plant ID69464
Plant NameCedar Field Solar Park
Google MapMap
Bing MapMap
Plant StateMI
CountyGladwin
Balancing Authority CodeMISO
SectorElectric Utility
Generator IDCDFSP
Nameplate Capacity (MW)145
Net Summer Capacity (MW)145
Net Winter Capacity (MW)145
TechnologySolar Photovoltaic
Energy Source CodeSUN
Prime Mover CodePV
Planned Operation Month7
Planned Operation Year2027
Status(V) Under construction, more than 50 percent complete
Latitude43.95
Longitude-84.55
Original text(V) Under construction, more than 50 percent complete
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idPlanned:943

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Proposed:1878

Sources EV-de8aadec4aba622ea7cc14a9
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 35c3910cd2b048639b3b326025ed7cbbb59f5e525e93abd99e9ce986d3b1310c

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Planned:943

Sources EV-154d973f080ae6adfe54d769
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 6a9bc7e4102095e1cdc97873fb4ab1ea812c2e07578aed091f454808449f1db3

Usage terms US government public domain

Source snapshots by date · USA · eia860m

Cedar Field Solar Park / CDFSP

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Entity ID5109
Entity NameDTE Electric Company
Plant ID69464
Plant NameCedar Field Solar Park
Google MapMap
Bing MapMap
Plant StateMI
CountyGladwin
Balancing Authority CodeMISO
SectorElectric Utility
Generator IDCDFSP
Nameplate Capacity (MW)145
Net Summer Capacity (MW)145
Net Winter Capacity (MW)145
TechnologySolar Photovoltaic
Energy Source CodeSUN
Prime Mover CodePV
Planned Operation Month7
Planned Operation Year2027
Status(V) Under construction, more than 50 percent complete
Latitude43.95
Longitude-84.55
Original text(V) Under construction, more than 50 percent complete
source_record_idPlanned:943

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Planned:943

Sources EV-154d973f080ae6adfe54d769
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 6a9bc7e4102095e1cdc97873fb4ab1ea812c2e07578aed091f454808449f1db3

Usage terms US government public domain

Source snapshots by date · USA · eia860

Cedar Field Solar Park / CDFSP

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Utility ID5109
Utility NameDTE Electric Company
Plant Code69464
Plant NameCedar Field Solar Park
StateMI
CountyGladwin
Generator IDCDFSP
TechnologySolar Photovoltaic
Prime MoverPV
OwnershipS
Duct BurnersX
Can Bypass Heat Recovery Steam Generator?X
Nameplate Capacity (MW)145
Summer Capacity (MW)145
Winter Capacity (MW)145
StatusU
Effective Month8
Effective Year2027
Current Month7
Current Year2027
Sector NameElectric Utility
Sector1
Previously CanceledN
Energy Source 1SUN
Original textU
source_record_id3_1_Generator_Y2025.xlsx#Proposed:1878

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Proposed:1878

Sources EV-de8aadec4aba622ea7cc14a9
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 35c3910cd2b048639b3b326025ed7cbbb59f5e525e93abd99e9ce986d3b1310c

Usage terms US government public domain

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel