Power assets and projects · USA · eia860m

Richland Parish Power Station 1&2 / 2A

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)469.3 MWOriginal source column definition · Generator · (P) Planned for installation, but regulatory approvals not initiated
As-of date 2026-08
Sources EV-710897f41bbb6b1fbea59d07
Net Summer Capacity (MW)435.4 MWOriginal source column definition · Generator · (P) Planned for installation, but regulatory approvals not initiated
As-of date 2026-08
Sources EV-710897f41bbb6b1fbea59d07
Net Winter Capacity (MW)469.3 MWOriginal source column definition · Generator · (P) Planned for installation, but regulatory approvals not initiated
As-of date 2026-08
Sources EV-710897f41bbb6b1fbea59d07
Detailed source fields
Original source fieldPublished value or condition
Entity ID11241
Entity NameEntergy Louisiana LLC
Plant ID69449
Plant NameRichland Parish Power Station 1&2
Google MapMap
Bing MapMap
Plant StateLA
CountyRichland
Balancing Authority CodeMISO
SectorElectric Utility
Generator ID2A
Unit CodeCC02
Nameplate Capacity (MW)469.3
Net Summer Capacity (MW)435.4
Net Winter Capacity (MW)469.3
TechnologyNatural Gas Fired Combined Cycle
Energy Source CodeNG
Prime Mover CodeCT
Planned Operation Month3
Planned Operation Year2030
Status(P) Planned for installation, but regulatory approvals not initiated
Latitude32.468339
Longitude-91.68038
Original text(P) Planned for installation, but regulatory approvals not initiated
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idPlanned:2056

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Proposed:1867

Sources EV-5a87693c47592bafd0d8d303
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 ebd28d92468d4f0c7de0b5b7d0cbebf9b97d00afc70c801f8c4fef930e20b349

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Planned:2056

Sources EV-710897f41bbb6b1fbea59d07
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 ff92ca92faa0180825117c1ec021137645f54ef7c55a2920079854e34b349b6e

Usage terms US government public domain

Source snapshots by date · USA · eia860m

Richland Parish Power Station 1&2 / 2A

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Entity ID11241
Entity NameEntergy Louisiana LLC
Plant ID69449
Plant NameRichland Parish Power Station 1&2
Google MapMap
Bing MapMap
Plant StateLA
CountyRichland
Balancing Authority CodeMISO
SectorElectric Utility
Generator ID2A
Unit CodeCC02
Nameplate Capacity (MW)469.3
Net Summer Capacity (MW)435.4
Net Winter Capacity (MW)469.3
TechnologyNatural Gas Fired Combined Cycle
Energy Source CodeNG
Prime Mover CodeCT
Planned Operation Month3
Planned Operation Year2030
Status(P) Planned for installation, but regulatory approvals not initiated
Latitude32.468339
Longitude-91.68038
Original text(P) Planned for installation, but regulatory approvals not initiated
source_record_idPlanned:2056

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Planned:2056

Sources EV-710897f41bbb6b1fbea59d07
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 ff92ca92faa0180825117c1ec021137645f54ef7c55a2920079854e34b349b6e

Usage terms US government public domain

Source snapshots by date · USA · eia860

Richland Parish Power Station 1&2 / 2A

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Utility ID11241
Utility NameEntergy Louisiana LLC
Plant Code69449
Plant NameRichland Parish Power Station 1&2
StateLA
CountyRichland
Generator ID2A
TechnologyNatural Gas Fired Combined Cycle
Prime MoverCT
Unit CodeCC02
OwnershipS
Duct BurnersX
Can Bypass Heat Recovery Steam Generator?N
Nameplate Capacity (MW)469.3
Nameplate Power Factor1
Summer Capacity (MW)435.4
Winter Capacity (MW)469.3
StatusP
Effective Month3
Effective Year2030
Current Month3
Current Year2030
Sector NameElectric Utility
Sector1
Previously CanceledN
Energy Source 1NG
Multiple Fuels?N
Original textP
source_record_id3_1_Generator_Y2025.xlsx#Proposed:1867

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Proposed:1867

Sources EV-5a87693c47592bafd0d8d303
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 ebd28d92468d4f0c7de0b5b7d0cbebf9b97d00afc70c801f8c4fef930e20b349

Usage terms US government public domain

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel